


























In this article, we study a single-machine scheduling problem of minimizing the total tardiness for a set of independent jobs. The processing time of a job is modeled as a step function of its starting time and a specific deteriorating date. A mixed integer programming model was applied to the problem and validated. Since the problem is known to be NP-hard, we proposed a heuristic named simple weighted search procedure (SWSP) and a general variable neighborhood search algorithm (GVNS). A perturbation procedure with 3-opt is embedded within the GVNS process in order to explore broader spaces. Extensive numerical experiments are carried out on some randomly generated test instances so as to investigate the performance of the proposed algorithms. By comparing to the results of the CPLEX optimization solver, the heuristic SWSP and the standard variable neighborhood search, it is shown that the proposed GVNS algorithm can provide better solutions within a reasonable running time.
此内容由惯性聚合(RSS阅读器)自动聚合整理,仅供阅读参考。 原文来自 — 版权归原作者所有。