




















In the $2$-Machine Flow Shop problem with exact delays the operations of each job are separated by a given time lag (delay). Leung et al. (2007) established that the problem is strongly NP-hard when the delays may have at most two different values. We present further results for this case: we prove that the existence of $(1.25-\varepsilon)$-approximation implies P$=$NP and develop a $2$-approximation algorithm.
此内容由惯性聚合(RSS阅读器)自动聚合整理,仅供阅读参考。 原文来自 — 版权归原作者所有。