























We consider the precedence-constrained scheduling problem to minimize the total weighted completion time. For a single machine several $2$-approximation algorithms are known, which are based on linear programming and network flows. We show that the same ratio is achieved by a simple weighted round-robin rule. Moreover, for preemptive scheduling on identical parallel machines, we give a strongly polynomial $3$-approximation, which computes processing rates by solving a sequence of parametric flow problems. This matches the best known constant performance guarantee, previously attained only by a weakly polynomial LP-based algorithm. Our algorithms are both also applicable in non-clairvoyant scheduling, where processing times are initially unknown. In this setting, our performance guarantees improve upon the best competitive ratio of $8$ known so far.
此内容由惯性聚合(RSS阅读器)自动聚合整理,仅供阅读参考。 原文来自 — 版权归原作者所有。