惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

云风的 BLOG
云风的 BLOG
GbyAI
GbyAI
G
Google Developers Blog
Engineering at Meta
Engineering at Meta
月光博客
月光博客
腾讯CDC
Recent Announcements
Recent Announcements
酷 壳 – CoolShell
酷 壳 – CoolShell
爱范儿
爱范儿
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
S
SegmentFault 最新的问题
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
阮一峰的网络日志
阮一峰的网络日志
博客园 - 【当耐特】
The GitHub Blog
The GitHub Blog
Last Week in AI
Last Week in AI
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
aimingoo的专栏
aimingoo的专栏
Google DeepMind News
Google DeepMind News
Y
Y Combinator Blog
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
Martin Fowler
Martin Fowler
A
About on SuperTechFans
博客园 - 叶小钗

cs.DS updates on arXiv.org

PAC Learning with Bandit Feedback: Sharp Sample Complexity in the Realizable Setting Algorithms with Polynomially-Improved Approximation Factors for the $2 \rightarrow q$ Norm, and Applications A computational phase transition for learning-to-sample from Ising models Covering vertices by sequential stars Fermi-Dirac machines as quantizations of neurons A Comprehensive Evaluation of Vertex Elimination Algorithms for Algorithmic Differentiation A Tight Bound on Localization of Electrical Flows Optimal Dimension-Free Sampling for Regularized Classification Reducing the Randomness in Partition Oracles for Bounded Degree Minor-Free Graphs Beyond the Half-Approximation: Fair and Efficient Online Class Matching Efficient Uniform Sampling of Surjections via their Profiles Tractable Maximization of Budgeted Phylogenetic Diversity on Networks Utilizing Node Scanwidth Fairness in Aggregation: Optimal Top-$k$ and Improved Full Ranking Learning-Augmented Online Scheduling with Parsimonious Preemption Entropy Equivalence Testing Lumberjack: Better Differentially Private Random Forests through Heavy Hitter Detection in Trees The Secretary Problem with a Stochastic Precursor Polynomial-Time Robust Multiclass Linear Classification under Gaussian Marginals Efficient Banzhaf-Based Data Valuation for $k$-Nearest Neighbors Classification Block-Sphere Vector Quantization An Approximation Algorithm for Graph Label Selection Iterative Chow Filtering for Learning with Distribution Shift Complexity of Non-Log-Concave Sampling in Fisher Information Stochastic Matching via Local Sparsification Finite Sample Bounds for Learning with Score Matching What is Learnable in Valiant's Theory of the Learnable? Provable Quantization with Randomized Hadamard Transform Min-Max Optimization Requires Exponentially Many Queries Fast and Compact Graph Cuts for the Boykov-Kolmogorov Algorithm A proximal gradient algorithm for composite log-concave sampling
Single-item lot sizing problem under budgeted lead-time u...
Romain Guillaume, Adam Kasperski, Szymon Wrobel, Pawel Zielinski · 2026-06-15 · via cs.DS updates on arXiv.org

In this paper, a single-item lot sizing problem with backordering is discussed. The time horizon is divided into planning periods, characterized by fixed and variable production costs, and future delivery periods with specified demands, where inventory holding and backordering costs may occur. For each planning period, a common nominal lead time is given. The true lead times can deviate to some extent from the nominal one, and their exact values are unknown at the planning step. We assume that lead times take only integer values and splitting production orders is not allowed. Furthermore, order crossovers are prohibited; thus, an order placed earlier cannot arrive after one placed later. A budgeted uncertainty set of possible lead-time scenarios is defined, where a budget allows us to control the amount of uncertainty of lead times. It is shown how to construct a family of production plans varying from the most optimistic (a best lead-time scenario occurs) to the most pessimistic (a worst lead-time scenario occurs). In order to compute these plans the R* criterion is applied which generalizes the conservative robust min-max criterion, commonly used in robust optimization. The computational complexity of the problem is investigated. Polynomial, pseudopolynomial time algorithms, and mixed integer programming formulations are proposed to solve the general problem and its special cases. The results of computational tests are provided that demonstrate that using the R* criterion can significantly enlarge the set of candidate production plans.