
























This paper resolves a long-standing open question in bicriteria scheduling regarding the complexity of a single machine scheduling problem which combines the number of tardy jobs and the maximal tardiness criteria. We use the lexicographic approach with the maximal tardiness being the primary criterion. Accordingly, the objective is to find, among all solutions minimizing the maximal tardiness, the one which has the minimum number of tardy jobs. The complexity of this problem has been open for over thirty years, and has been known since then to be one of the most challenging open questions in multicriteria scheduling. We resolve this question by proving that the problem is strongly NP-hard. We also prove that the problem is at least weakly NP-hard when we switch roles between the two criteria (i.e., when the number of tardy jobs is the primary criterion). Finally, we provide hardness results for two other approaches (constraint and a priori approaches) to deal with these two criteria.
此内容由惯性聚合(RSS阅读器)自动聚合整理,仅供阅读参考。 原文来自 — 版权归原作者所有。