惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

B
Blog RSS Feed
Google DeepMind News
Google DeepMind News
罗磊的独立博客
Martin Fowler
Martin Fowler
博客园_首页
Stack Overflow Blog
Stack Overflow Blog
Last Week in AI
Last Week in AI
The GitHub Blog
The GitHub Blog
B
Blog
C
Check Point Blog
WordPress大学
WordPress大学
G
Google Developers Blog
CTFtime.org: upcoming CTF events
CTFtime.org: upcoming CTF events
量子位
月光博客
月光博客
U
Unit 42
Engineering at Meta
Engineering at Meta
有赞技术团队
有赞技术团队
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
大猫的无限游戏
大猫的无限游戏
博客园 - 聂微东
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
Y
Y Combinator Blog
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
Vercel News
Vercel News
Application and Cybersecurity Blog
Application and Cybersecurity Blog
博客园 - 【当耐特】
cs.CV updates on arXiv.org
cs.CV updates on arXiv.org
cs.AI updates on arXiv.org
cs.AI updates on arXiv.org
Jina AI
Jina AI
S
Secure Thoughts
aimingoo的专栏
aimingoo的专栏
D
Darknet – Hacking Tools, Hacker News & Cyber Security
I
Intezer
Latest news
Latest news
V
Vulnerabilities – Threatpost
D
Docker
Attack and Defense Labs
Attack and Defense Labs
Help Net Security
Help Net Security
S
Security @ Cisco Blogs
Forbes - Security
Forbes - Security
MongoDB | Blog
MongoDB | Blog
云风的 BLOG
云风的 BLOG
L
LINUX DO - 热门话题
P
Palo Alto Networks Blog
Cloudbric
Cloudbric
Spread Privacy
Spread Privacy

AI demand is so high, AWS customers are trying to buy out its entire capacity | Network World

Cisco: Latest news and insights 2026 network outage report and internet health check Selector targets the network visibility gap in multi-cloud infrastructure AI reshapes cybersecurity workforce priorities as IT teams brace for new risks Top network and data center events of 2026 How AI is transforming network incident response (and where it still falls short) Google opens TPUs to enterprises beyond its own cloud via Blackstone JV AI, cybersecurity skills top IT pay premiums Startup Bolt Graphics promises 5x performance over Nvidia’s best GPU Wireless security is a battle of AI vs. AI NetOps teams look to AI to automate Day 2 operations Digital twins reshape network and data center management Network outages, power failures strain data center resiliency Five takeaways from Cisco's blowout quarter and what it means to customers Cisco to cut nearly 4,000 jobs despite strong growth in AI, enterprise networking Startup SPAN teams with Nvidia to put data center nodes in your backyard Hard drive shortage affecting enterprise storage needs Wi-Fi 8 is closer than you think. Here’s what you need to know Cisco open-sources agentic AI security spec HPE revamps private cloud stack for enterprises rethinking VMware Versa takes aim at fragmented enterprise security with CSPM, orchestration update, and AI agent controls Red Hat opens Ansible to AI agents, within limits Red Hat offers endless Linux support — for a fee Red Hat: Sovereignty is more than just compliance Tech job postings hit three-year high as AI demand fuels hiring rebound HPE memory server targets compute-heavy and agentic AI workloads PCI group begins work on new spec to support bandwidth-hungry apps like AI, HPC Q&A: Quantum physicist Sonia Fernández-Vidal on why classical computing isn't going anywhere OpenAI-led consortium seeks to address AI processing bottlenecks AWS hit by US-East-1 outage after data center thermal event Gluware's Titan rises to meet Mythos network vulnerability challenge AMD launches AI-targeted PCIe cards for current servers Supply constraints, optical advances dominate Arista's Q1 Lumen advances cloud networking vision with $475M Alkira buy HPE bolsters autonomous network operations for Mist, Aruba Central Netskope launches AI agents for SOC and NOC automation Intel, behind in AI chips, bets on quantum and neuromorphic processors Switch storm coming: Gartner forecasts price hikes, long lead times for enterprise data center switches Extreme moves toward autonomous networking with advanced AI agent, management tools Broadcom bets big on VMware Cloud Foundation 9.1 IBM unveils its blueprint to help enterprises run AI at the core of their business Ruckus Networks on the move again, this time acquired by Belden for $1.85 billion AMD and Intel partner to deliver AI performance advancement Cisco grabs Astrix to secure AI agents Beyond the pitch: A look at Atlético Madrid's connected stadium StarlingX 12.0 is right on time for mixed-hardware edge deployments Cisco nerds out: May the Fourth be with your AI assistant Memory shortage and cost surge push enterprises toward the cloud Extreme Networks: Memory advantage, Wi-Fi 7 and competitive flux drive momentum Scenes from the great data center revolt Enterprise Spotlight: Transforming software development with AI When 170,000 people show up: Network refresh readies Churchill Downs for Kentucky Derby IT certification pay surges as noncertified skills slump QuEra claims quantum error correction breakthrough with 2-to-1 qubit ratio HPE expands ProLiant line with rugged edge servers Cisco bolsters security, AI support in latest SD-WAN release The era of chatbot AIOps is fading as agentic AI gains traction Auvik bets agentic AI can fill the networking skills gap AI data flows force rethink of data center networking at Backblaze Nvidia's 'AI insurance policy' balances immediate and future AI approaches Cirrascale to offer on-prem Google Gemini models Space data-center news: Roundup of extraterrestrial AI endeavors Network jobs watch: Hiring, skills and certification trends Cisco switch aimed at building practical quantum networks How AI is changing copper, fiber networking Almost 40% of data center projects will be late this year, 2027 looks no better It’s the end of set-and-forget security Google bets on workload-specific TPUs with 8t and 8i launch SUSE bets automated migration can break VMware's grip on virtualization How Zero Networks is closing the network enforcement gap for AI agents Cloudflare wants to rebuild the network for the age of AI agents AI fuels wireless talent shortage Broadcom's Facebook friend will help train it to accelerate AI workloads Data centers are costing local governments billions Equinix offering targets automated AI-centric network operations AI shifts IT roles from operator to orchestrator IBM unveils security services for thwarting agentic attacks, automating threat assessment Maine to put brakes on big data centers as AI expansion collides with power limits Satellite backhaul service Globalstar has a new, rich owner amid challenging market conditions DNS security is often inadequate, and network engineers should get more involved Curious about quantum? Check out training options from ISC2, IBM, AWS and more Cisco just made moves to own the AI infrastructure stack Data centers are moving inland, away from some traditional locations Fixing encryption isn't enough. Quantum developments put focus on authentication Intel: Latest news and insights Linux 7.0 debuts with some big changes for networking Intel secures Google cloud and AI infrastructure deal OpenAI puts part of Stargate project on hold over runaway power costs Broadcom strikes chip deals with Google, Anthropic Cisco to acquire Galileo for AI observability Neoclouds gain momentum in a supply-constrained world Lumen: Upstream network visibility is enterprise security's new front line Yael Nardi joins Minimus as Chief Business Officer to head growth strategy Nvidia Rubin GPUs may be delayed, slowing the next phase of AI infrastructure What is AI networking? How it adds intelligence to your infrastructure Google owns the most AI compute, and it built it its way Aria Networks raises $125M and debuts its approach for AI-optimized networks Intel bets on Terafab to help it reassert itself in the AI chip race New v2 UALink specification aims to catch up to NVLink Cisco joins Anthropic’s multivendor effort to secure AI software
Deconstructing the data center: A massive (and massively liberating) project
2026-04-30 · via AI demand is so high, AWS customers are trying to buy out its entire capacity | Network World

A few years back, Bhaskar Ramachandran read the tea leaves and what he saw was clear: With all the enhancements hyperscalers continuous make, there was no value in having on-premises data centers any longer.

“There is just no way for a private company to match that,” says Ramachandran, global vice president and CIO of paints and coatings manufacturer PPG. “This is their business, and they’re really good at it, and it was clear that the size of the hyperscalers is just going to win over the infrastructure game. So it didn’t make sense for us to keep up with the infrastructure.”

PPG began dismantling its eight global data centers about four years ago, with the final one completed in November 2025. For a 143-year-old company that has gone through 60-some acquisitions, that was no small feat.

Applications and infrastructure became a lot to manage, combined with trying to maintain a strong cybersecurity posture and compliance. “You can’t consistently manage this sort of a footprint, and it becomes really unwieldy very quickly,” Ramachandran says.

Decommissioning a data center is like defusing a complex bomb. Every wire, sequence, and step must be handled with care, because one wrong move can be a blow to your organization in downtime risks, data breaches, or a hit to its bottom line. 

“The decommissioning of data centers is underestimated in terms of complexity, financial risks, reputation loss, and data exposure,” according to Gartner. The firm estimates that by 2030, twice as many enterprise data centers will have been decommissioned compared to those built. Reasons include consolidations, obsolescence, and shifting workloads to cloud and colocation services.

The inadvertent data center

In some instances, data centers have cropped up without much forethought. “Most organizations I work with didn’t build a data center intentionally — they grew into one,” says Aaron Walker, CEO of IT consultancy Overbyte, and a former associate partner at IBM Consulting. “A rack in a closet became a row in a repurposed room, and suddenly, you have a facility that was never designed for the job holding years of infrastructure decisions.”

Deconstructing that environment is work that often gets overlooked, says Walker.

He recently consulted with a large, fully remote online school in the throes of this process. The deconstruction work began with a full audit of what systems existed. From there every workload was categorized to determine what gets migrated, what gets moved to cloud-native infrastructure, and what gets retired entirely, he says.

Then came the physical side: decommissioning hardware and deciding what equipment had residual value and what to recycle. 

“The timeline pressures are real,” Walker says. “You can’t just power things down. Dependencies surface that nobody documented.”

The IT organizational side had its own challenges. “People have years of institutional knowledge tied to physical systems, and there’s genuine anxiety about dismantling something they built and maintained,” he says. 

Walker’s team also ran into issues trying to upgrade systems during the migration, which is generally a mistake, he says. “A data center deconstruction is already a significant change event, and layering additional upgrades on top of it introduces unnecessary risk. In most cases, it is better to separate modernization from migration.”

From start to finish, the deconstruction ran about a year, but timing will vary from project to project, he says.

Less hassle, more flexibility

When the time came for digital marketing agency Helium SEO to consider what to do with its data center, CTO Paul DeMott says the math was simple. “We were paying $12,000 a month toward the colocation fees, hardware support, and the maintenance cost for the physical servers sitting in racks. Cloud infrastructure promised better reliability, automatic scaling, and way less hassle once we were done moving everything.”

The most compelling reason to rid itself of a physical footprint, though, was flexibility. Physical servers equated to capacity planning six months ahead, DeMott says, and if they needed more resources, IT had to wait weeks for hardware to come and get installed.

“Cloud allows resources to be spun up in minutes and shut down at the same speed,” he says. “We went from buying expensive hardware that depreciated to purchasing what we are actually using.”

IT began by creating a list of all the apps running on physical servers and classifying them according to how difficult it would be to move them. “Simple web apps moved first as they barely needed changes,” DeMott says. “Databases and anything which stores data — that’s a little bit later because we’d have had to plan the migration well.”

Some older apps had to be changed to work on the cloud, he adds. The actual move took place over six months, and IT decommissioned the data center while deploying apps to the cloud in tandem, moving the services step by step with backup plans for each one.

Still, the process wasn’t seamless. “Translating 15TB of data to the cloud takes 72 hours on our internet connection, and that was the biggest problem,” DeMott notes. IT ended up using AWS Snowball, a physical hard drive, because it took staff weeks to upload everything, “and [it] ruined the performance in our network.”

Another issue was figuring out the cloud costs, which DeMott characterizes as “brutal. Different types of servers, storage, data transfer costs made it almost impossible to budget,” he says. “Our first month bill accrued at 40% more than we estimated because we forgot about charges for moving data out of the cloud.”

It took IT three months of “fumbling” to get costs below what the company paid for the data center before things stabilized.

The power of ‘cloud only’

Once PPG made the decision to dismantle its data centers and move everything to the cloud, it was time to spread the word internally. “When you say, ‘cloud only,’ it makes it much easier for you to have conversations,” Ramachandran says. “It just sets the entire organization up on a single mission … just those two words make it very, very clear to everybody in the company what that means. There is no room for interpretation.”

The news was revealed at a global town hall, and initially, Ramachandran says, the sentiment was, “this too, shall pass. Then people decided to get on board.”

There were the typical organizational change management issues to deal with. Building momentum takes time, he says, but once the first data center was shut down, people came to the realization that “Okay, we are actually doing this,” Ramachandran says. “Then there was no resistance … everybody got on board, and things started to accelerate.”

Officials ensured that all the training IT needed was made available to them and the company paid for everything, certifications included. “We recognized it in town halls; anybody that went through this training and got the certification. We celebrated people. We promoted people that did the things we wanted them to do,” he says. All of this helped reinforce the mission.

“For the most part, business users didn’t care; their apps were available and they didn’t care where they were,” although there were a couple of exceptions among more technically savvy employees who were concerned about workflow and the security implications of cloud. There was a perception among some that a data center was more secure, Ramachandran says.

That led to looking at publicly available information on all the cybersecurity incidents in the recent past. The research indicated a clear pattern, he says.

“And the pattern is: The more significant cybersecurity events were actually happening to companies” that were largely on-prem environments, Ramachandran observes. “So you came to this point where the cloud actually became lot more secure than on-prem infrastructure.”

There are several reasons why, he maintains, including that, relatively speaking, it is a lot easier to implement security policies consistently in the cloud because “you have a single pane of glass enforcement of policies that you don’t have in an on-prem environment.”

This makes managing your attack surface area more straightforward, Ramachandran says. “So you put all of this together, you package it up on the presentation, and talk to those people one on one, and then say, ‘This is why.’”

The dismantling process

PPG works with a single hyperscaler for its business in China and three others. Deciding what apps went where was largely a function of the technology and which hyperscaler “lends itself to that brand of technology versus the other.” In some instances, where a decision of which to use wasn’t clear, IT made the call.

Step one was deciding on an approach, and PPG opted to modernize its apps at the same time as the deconstruction work. “When you pull together the business case to modernize applications, we came to a conclusion that if we do modernization on the application layer and the infrastructure layer at the same time, I would probably be retired by the time we migrated the data center,” Ramachandran says.

That made it easy to decide when to do a lift and shift and when to not bother migrating certain applications, he says. Then IT could focus on other business priorities to modernize the workforce.

“We just adjusted our roadmap to say the new [app] would go straight into the cloud” while not bothering to move older workloads, Ramachandran says.

The human element

The next step was “finding the people that are hungry to do something new and probably have a bit of experience and … they are waiting for someone to say, ‘Hey, let’s do this,’” Ramachandran says of the data center deconstruction. “They are forward thinkers. Every organization in our scale has [them]. It’s identifying those people and then … empowering them. They became the leaders in the new infrastructure.”

Once the migration started, it was important to celebrate the wins. That gets more people interested in being a part of the new organization PPG was forming called the Cloud COE (center of excellence).

The biggest mistake companies make is treating deconstruction as a single project instead of a phased operational shift, says Roland Parker, founder and CEO of Impress Computers, a managed IT services and cybersecurity firm in Houston.

“We walked one 200-person manufacturer through moving workloads in priority tiers — production-critical systems last, not first — which kept their floor running while we systematically eliminated physical infrastructure over 14 months,” he says.

However, it’s “the human side [that] kills more timelines than the tech does,” Parker observes. “Field supervisors and plant managers have work-arounds built around how legacy systems behave.” So, before touching a single rack, Parker’s team audits those informal processes, “because if you don’t, you migrate the infrastructure and orphan the people who actually use it.”

Overbyte’s Walker agrees, saying that almost all the snafus his team ran into during the online school deconstruction project were not technical, but came down to visibility. “At some point, you have to confront unknown systems; things with incomplete or outdated documentation,” he says. “We had moments where, after beginning to deprovision systems, stakeholders surfaced saying, ‘Wait, that’s still in use.’”

Dismantling systems is not the end

PPG experienced no disruptions during the dismantling process, Ramachandran says, other than some tactical delays and contracts that needed updating.

“There were some learnings on the network side because networking can get complex,” he says. “Sometimes, we extended the outage windows” to up to five hours, for example. Those were the hiccups.”

From start to finish, the decommissioning process of all eight data centers took about three years. “The end is not migrating all the workloads. The end is actually shutting down the data center,” Ramachandran stresses. This requires deconstructing the power, the cooling, fire systems, and multiple generators used for backup, which had to be removed by helicopter.

“You have to take the diesel fuel out and dispose it off and sell it. We have to get recertification of the building for safety, because this is a building where you had kilowatts of power coming in, which basically [also] went through a deconstruction process,” he says. “So you have to get a safety certification … all of this takes time because we have to give the building back to the building management the way they gave it to us.”

What data center deconstruction buys you

The painstaking data center deconstruction process has given Ramachandran valuable insight. “Make sure your best people spend time creating value for the business, as opposed to babysitting infrastructure,” he says, because infrastructure no longer adds value.

“You also do a lot of inherent risk management by getting rid of data centers and moving to a cloud environment you don’t have to worry about,” he adds. Noting the current state of the economy, Ramachandran says coping with sudden price increases for memory and chips is no longer stressful since they aren’t buying infrastructure.

“You’re basically giving back working capital to the company, because you’re moving the organization from a fixed capital environment to your variable cost model completely,” he says, “and you don’t have to refresh your hardware every four or five years.”

Cost was never the objective for the data center deconstruction, Ramachandran notes. “Nonetheless, when we did the business case, we said it’s not going to cost us any more or any less, but will buy us better security, better flexibility, better agility for the organization,” as well as better focus and technology. “And we achieved all of those.”

The value is in all those other areas. “We are not data center operators. The team is now focused on delivering applications that are meaningful to the business,” Ramachandran says. “The team is much closer than ever to the business because we are not talking infrastructure but how to make the business better.”

Walker says companies should measure twice, cut once. “Most teams want to jump straight into migration,” he says, “but the real work is building a complete inventory and mapping dependencies upfront.”

While it made sense for PPG to modernize some apps at the same time as the data center deconstruction work, Walker advises IT leaders to resist the urge to do everything at once. “Focus on moving what you understand first, and isolate the unknowns early,” he says.
“The success of these projects is usually determined by how well you handle the edge cases, not the easy wins.”

Any new technological development IT can make without interrupting operations dramatically reduces time to market, Ramachandran says.

Working on the latest technologies makes IT happy, and that helps with talent retention, he adds, “because we can say we’re cloud only, so this 143-year-old company looks modern. That is meaningful in so many ways.”

SUBSCRIBE TO OUR NEWSLETTER

From our editors straight to your inbox

Get started by entering your email address below.