惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

H
Help Net Security
爱范儿
爱范儿
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
博客园 - 三生石上(FineUI控件)
大猫的无限游戏
大猫的无限游戏
Hugging Face - Blog
Hugging Face - Blog
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
Vercel News
Vercel News
人人都是产品经理
人人都是产品经理
G
Google Developers Blog
WordPress大学
WordPress大学
S
SegmentFault 最新的问题
雷峰网
雷峰网
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
Jina AI
Jina AI
博客园 - 叶小钗
D
DataBreaches.Net
D
Docker
月光博客
月光博客
博客园 - 司徒正美
Last Week in AI
Last Week in AI
有赞技术团队
有赞技术团队
腾讯CDC
酷 壳 – CoolShell
酷 壳 – CoolShell

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Nandyal Collector sets July 1 deadline to finish 2,103 Ja...
Hareesh P · 2026-06-23 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
Collector Rajakumari Ganiya inspects feeder-channel restoration and minor irrigation tank works under the ‘Jaladhara-Jalaharathi’ scheme at Tangadancha in Jupadu Bungalow mandal, Nandyal district, on Tuesday.

Collector Rajakumari Ganiya inspects feeder-channel restoration and minor irrigation tank works under the ‘Jaladhara-Jalaharathi’ scheme at Tangadancha in Jupadu Bungalow mandal, Nandyal district, on Tuesday. | Photo Credit: Special Arrangement

Nandyal district administration has set a target of completing the works taken up under the ‘Jaladhara-Jalaharathi’ programme before July 1. Collector Rajakumari Ganiya had directed the officials concerned to meet the targets for completing the works, third-party verification and documentation of success stories.

According to officials, 2,103 works were sanctioned in the district under the initiative; of them, 1,587 have been completed so far, and 516 are pending.

As rainfall is expected in the first week of July, officials were asked to draw up a special action plan to complete the remaining works. She said a Central Water Commission team would carry out third-party verification of water conservation structures built under NREGS as part of the ‘Jal Sanchay-Jal Bhagidari’ programme. Officials were checking whether the photos uploaded online matched the structures on the ground, she said. The State government’s intelligence wing and special third-party teams are also closely monitoring the works.

The Collector warned against marking tasks ‘complete’ in the online system before they were finished on the ground, or compromising on quality in the rush to complete them. She also wanted no discrepancies between field-level reports and online data.

Officials found that Rudravaram mandal had the highest number of pending tasks, 52, followed by Dhone (46) and Kolimigundla (43); the officials concerned were advised to pay special attention to pending works in other mandals as well.

“While recording the success stories of the ‘Jaladhara’ programme, the documentation should include not only the details of the works but also the tangible results achieved through them,” Ms. Rajakumari told officials. The extent to which the ayacut (command area) had been stabilised or expanded through the development of tanks should also be documented, she said.

The improvement in groundwater levels and the benefits to farmers from the increased capacity of the tanks should also be documented.

Published - June 23, 2026 04:26 pm IST