惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Microsoft Azure Blog
Microsoft Azure Blog
GbyAI
GbyAI
P
Proofpoint News Feed
Engineering at Meta
Engineering at Meta
Recent Announcements
Recent Announcements
L
LangChain Blog
B
Blog
阮一峰的网络日志
阮一峰的网络日志
Microsoft Security Blog
Microsoft Security Blog
博客园 - 【当耐特】
M
MIT News - Artificial intelligence
D
Docker
WordPress大学
WordPress大学
J
Java Code Geeks
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
The GitHub Blog
The GitHub Blog
博客园 - 叶小钗
Last Week in AI
Last Week in AI
Stack Overflow Blog
Stack Overflow Blog
有赞技术团队
有赞技术团队
MyScale Blog
MyScale Blog
H
Hackread – Cybersecurity News, Data Breaches, AI and More
MongoDB | Blog
MongoDB | Blog
博客园 - Franky

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Kochi Bypass project gets a fillip with Central nod
The Hindu Bureau · 2026-06-21 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
The Centre has sanctioned a 50-km-long, eight-lane wide greenfield corridor linking Aroor on NH 66 with Angamaly on NH 544.

The Centre has sanctioned a 50-km-long, eight-lane wide greenfield corridor linking Aroor on NH 66 with Angamaly on NH 544. | Photo Credit: File Photo

The long-overdue Kochi Bypass project has got a fillip, with the Centre sanctioning a 50-km-long, eight-lane-wide greenfield corridor linking Aroor on NH 66 with Angamaly on NH 544.

This would enable inter-district and other vehicles to avoid the congested and accident-prone Aroor-Edapally NH 66 Bypass, the Edapally-Angamaly NH 544 stretch, and the more than a dozen bottlenecked junctions along the route, saving considerable time and fuel.

The Kochi Bypass had been mooted a decade ago as a 44-km-long, six-lane-wide corridor linking Nettoor on the NH 66 Bypass with Karayamparambu, located north of Angamaly. The project remained mired in uncertainty following the expiry of its 3A notification in 2024.

“A fresh 3A notification for the proposed eight-lane-wide NH project would be issued shortly. The Centre has permitted the acquisition of land at a width of 70 metres (as compared to the earlier 45-metre-wide NH proposal). This would enable hewing out an eight-lane-wide stretch, which could further be widened to ten lanes in the project’s second phase,” said Benny Behanan, MP, while attributing the delay in kicking off the project’s construction to the slow pace of land acquisition during the term of the LDF government.

This further resulted in the traffic survey report conducted five years ago for the six-lane Kochi Bypass project becoming outdated. This necessitated a fresh traffic survey, which cited the need for an eight-lane corridor, considering the massive increase in inter-State, inter-district, and intra-district vehicular traffic, added Mr. Behanan, who had raised the demand for the project multiple times in the Lok Sabha.

While stating that the proposed Kochi Bypass would be eight lanes wide, NHAI sources said that further details of the project are awaited.

The decision to extend the alignment from Nettoor to Aroor has, in turn, raised questions about the trumpet-shaped flyover that the NHAI had mulled at Nettoor. A smaller version of the butterfly-shaped cloverleaf flyover, the trumpet flyover was to cater to traffic pouring into Nettoor from the NH Bypass, the Kochi Bypass, and the Kochi Port Connectivity NH.

Published - June 21, 2026 09:24 pm IST