惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

S
SegmentFault 最新的问题
博客园 - 三生石上(FineUI控件)
WordPress大学
WordPress大学
博客园 - 【当耐特】
月光博客
月光博客
Vercel News
Vercel News
D
Docker
I
InfoQ
Apple Machine Learning Research
Apple Machine Learning Research
博客园 - 叶小钗
MongoDB | Blog
MongoDB | Blog
GbyAI
GbyAI
有赞技术团队
有赞技术团队
雷峰网
雷峰网
博客园 - 聂微东
小众软件
小众软件
Y
Y Combinator Blog
腾讯CDC
L
LangChain Blog
The GitHub Blog
The GitHub Blog
宝玉的分享
宝玉的分享
Stack Overflow Blog
Stack Overflow Blog
大猫的无限游戏
大猫的无限游戏
T
The Blog of Author Tim Ferriss

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
DMK govt.’s work in Electricity Dept. ‘conveniently ignor...
The Hindu Bureau · 2026-06-26 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

Countering the White Paper released by Electricity Minister R. Nirmalkumar, former Minister for Electricity V. Senthilbalaji accused the TVK-led government of publishing a “convenient report” while omitting the work done during the erstwhile DMK regime.

Addressing journalists in Chennai, Mr. Senthilbalaji said it was the previous DMK government that saved the Electricity Department.

“The demand for electricity increases every year. Though the demand kept rising over the past five years, we provided uninterrupted and uniform supply. During the earlier AIADMK regime, the electricity tariff was hiked thrice — by 37%, 3.5%, and 16%. Even with those tariff hikes, the revenue deficit soared to the range of ₹56,000 crore to ₹58,000 crore. However, over the last five years, the gap between revenue and expenditure was reduced to ₹34,447 crore,” he said.

Furthermore, by lowering the interest rates on loans taken by the electricity board, ₹1,200 crore - ₹1,500 crore was saved per year, and the revenue generated from the sale of fly ash obtained from thermal power stations rose to around ₹160 crore, he said.

When the DMK assumed office in 2021, the total debt of the Tamil Nadu Electricity Board stood at ₹1,59,731 crore, with around ₹15,000 crore being paid towards interest for just a single year, he said. He added that in the last five years, ₹75,000 crore had been paid solely in interest. Power generation costs, electricity procurement costs, and transmission charges had also increased over the past five years, he said.

Asserting that electricity was never procured at inflated prices, he said power generation capacity had been increased by 9,000 MW during the last five years.

“When we came to power, projects such as the Kundah project and the Kolli Hills project were in their initial stages. We completed a significant portion of the work on them,” he said, adding that a staff shortage should not be cited as a reason for the current electricity issues.

Pointing out that Chief Minister C. Joseph Vijay recently distributed appointment orders to 401 individuals in the Electricity Department, Mr. Senthilbalaji said all of them were selected during the DMK regime.

The increase in electricity consumption by the industries was not mentioned in the White Paper, he added.

Published - June 25, 2026 10:13 pm IST