惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

阮一峰的网络日志
阮一峰的网络日志
博客园 - 司徒正美
D
DataBreaches.Net
宝玉的分享
宝玉的分享
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
博客园 - 【当耐特】
人人都是产品经理
人人都是产品经理
博客园 - Franky
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
IT之家
IT之家
博客园 - 三生石上(FineUI控件)
J
Java Code Geeks
腾讯CDC
博客园_首页
The Cloudflare Blog
S
SegmentFault 最新的问题
C
Check Point Blog
美团技术团队
爱范儿
爱范儿
大猫的无限游戏
大猫的无限游戏
Hugging Face - Blog
Hugging Face - Blog
T
The Blog of Author Tim Ferriss
A
About on SuperTechFans
Blog — PlanetScale
Blog — PlanetScale

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Ramp up biomining capacity at Ghazipur landfill: Sood to MCD
The Hindu Bureau · 2026-06-27 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
Delhi Urban Development Minister Ashish Sood inspecting the Ghazipur landfill on Friday.

Delhi Urban Development Minister Ashish Sood inspecting the Ghazipur landfill on Friday. | Photo Credit: SHIV KUMAR PUSHPAKAR

Urban Development Minister Ashish Sood on Friday directed the Municipal Corporation of Delhi (MCD) to increase biomining capacity at the Ghazipur landfill from 7,000 metric tons per day (TPD) to 12,000 TPD by July 31 to meet the December 2027 deadline for clearing the waste at the Capital’s oldest garbage dump.

Mr. Sood issued the directions while inspecting the 70-acre landfill. “The people of Delhi deserve permanent solutions, not temporary measures. Today, we have identified the major bottlenecks, fixed timelines for resolving them and issued clear directions to accelerate biomining,” he said. The government’s objective is not merely to reduce the height of the landfill but to “permanently eliminate Delhi’s legacy waste challenge through scientific and time-bound remediation”, said the Minister.

He added that the Ghazipur remediation project will now be reviewed every week, and he will revisit the landfill next month to assess progress on the directions issued during the inspection.

Reviewing the project’s progress, he said Phase I, carried out between November 2022 and November 2024, had achieved biomining of only 13.9 lakh metric tons against the contracted target of 30 lakh metric tons. The government has set a target of clearing the remaining waste by December 2027.

Submit action plan 

Mr. Sood ordered officials to ensure fresh municipal waste is processed separately from legacy waste to prevent further accumulation at the site. He asked the MCD to submit a two-month action plan for fresh waste management. According to a statement, around 2,400-2,500 metric tons of fresh waste reach the Ghazipur landfill every day from Shahdara North and Shahdara South zones. While a large portion is diverted to the waste-to-energy plant, nearly 800 metric tons continue to be dumped at the site daily.

As per an April 2026 drone survey, Ghazipur landfill contained 67.81 lakh metric tons of waste. Between April 30 and June 25, around 3.39 lakh metric tons were processed, bringing the total waste at the site to 66.68 lakh metric tons, including both fresh and legacy waste. The Minister directed the civic body to deploy more vehicles to transport inert material generated during biomining after officials informed him that disposal arrangements had been made at the NTPC Eco Park, around 23 km away. A compliance report has been sought within a week.

Officials said nearly 24 lakh metric tons of legacy waste have been processed under the ongoing Phase II of the project, with about 20 acres of land reclaimed so far. The second phase, awarded in March 2025, aims to biomine 30 lakh metric tons of waste by September 2026. 

Published - June 27, 2026 12:46 am IST