惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
U
Unit 42
IT之家
IT之家
Y
Y Combinator Blog
T
Tailwind CSS Blog
B
Blog
大猫的无限游戏
大猫的无限游戏
博客园 - 叶小钗
Jina AI
Jina AI
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
I
InfoQ
J
Java Code Geeks
F
Fortinet All Blogs
T
The Blog of Author Tim Ferriss
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
H
Hackread – Cybersecurity News, Data Breaches, AI and More
人人都是产品经理
人人都是产品经理
腾讯CDC
Hugging Face - Blog
Hugging Face - Blog
GbyAI
GbyAI
博客园 - 司徒正美
The GitHub Blog
The GitHub Blog
酷 壳 – CoolShell
酷 壳 – CoolShell
L
LangChain Blog

Opinion, Editorial, Views, Columnists, Columns | The HinduBusinessLine

Rupee can’t be defended from just one side Railways’ performance Why not have a women-only party? Labour pangs Pak’s peculiar comeback on the global stage Letters to Editor India has jobs, but it needs better ones Cross-border insolvency laws and trade A major health challenge Editorial. Snooping around Letters to the Editor dated April 20, 2026 Real-time metric for factory output All you want to know about the women’s reservation and delimitation bills fiasco Editorial. Process deficit Letters to the Editor dated April 19, 2026 WPI effect on new GDP series The tragic reality of police brutality India’s AI value paradox Prepare the ground India-Korea economic ties poised to strengthen Nari Shakti Bill — a missed opportunity Natural farming should become mainstream policy Insights from new GDP data Strategies to enhance fertilizer security Pathway to maritime insurance sovereignty Why the GoP’s jittery Clear the smoke Aiding piped gas push Stocks are the least over-priced asset in India Is TCS harassment case tip of the iceberg?
Editorial. Nuclear milestone
2026-04-07 · via Opinion, Editorial, Views, Columnists, Columns | The HinduBusinessLine
Prime Minister Narendra Modi witnesses initiation of core loading of India’s indigenous Prototype Fast Breeder Reactor, at Kalpakkam in Tamil Nadu on March 4 (File photo)

Prime Minister Narendra Modi witnesses initiation of core loading of India’s indigenous Prototype Fast Breeder Reactor, at Kalpakkam in Tamil Nadu on March 4 (File photo) | Photo Credit: Sanal M Sudevan _11657@Chennai

The 500 MW Prototype Fast Breeder Reactor (PFBR) at the Kalpakkam nuclear energy complex near Chennai has gone critical — meaning, a sustained nuclear chain reaction has begun inside the reactor, a prelude to electricity generation. It is a heartening milestone, even if the PFBR suffered a 15-year delay and cost ₹8,181 crore, against the originally estimated ₹3,492 crore. The time and cost overruns seem unconscionably high, but they deserve condonation because building fast breeder reactors is technically very challenging.

Only Russia operates them commercially; France and Japan abandoned their efforts after finding the technical challenge unnecessary, while the US stepped back largely on economic considerations. China’s CFR-600 is in its early stage of operation. Thus, India is on the cusp of becoming only the third country in the world to have a commercial fast breeder reactor. It will be 12-18 months before the PFBR starts supplying electricity to the grid, after tests and turbine synchronisation. It is important for the various arms of the Department of Atomic Energy to ensure that all projects — those under implementation and planned — are fast-tracked. BHAVINI, the government company set up to build and operate breeder reactors, should lose no time in implementing the plan to build two more breeder reactors at the same site, and four more elsewhere.

The PFBR is fuelled by a mixture of oxides of plutonium-239 and uranium-238, both of which come from the conventional pressurized heavy water reactors that India runs. The PFBR is a ‘breeder’ — it produces more Pu-239 than it consumes, by converting U-238 into more Pu-239. Hopefully, the next two breeder reactors will use metallic fuel — a mixture of pure Pu-239 and U-238 rather than their oxides — to increase the breeding ratio so that more Pu-239 is produced. Metallic fuels are the holy grail of fast breeder reactors; India should make the shift to metallic fuels, however tough, a high priority. Once sufficient inventory of Pu-239 is built, India can move to the thorium cycle.

Fast breeder reactors can also convert thorium — which India has in plenty — into another fissile material, uranium-233. However, producing U-233 from thorium comes at the cost of Pu-239 production. While India should prioritise Pu-239, it should explore other ways of converting thorium into U-233. There are several options. This includes an ‘accelerator-driven subcritical system’ (ADSS) — a method of irradiating thorium to produce U-233. The ADSS project has been on the anvil at the Bhabha Atomic Research Centre since 2001 and should be fast-tracked. Further, the DAE should take up construction of the 300 MW Advanced Heavy Water Reactor thorium reactor, for which the design is ready. Alongside, the government should address the delays that continue to dog several other projects under the Department of Atomic Energy — such as the ₹9,859-crore fast reactor fuel cycle facility.

Published on April 7, 2026