惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

罗磊的独立博客
Google DeepMind News
Google DeepMind News
MyScale Blog
MyScale Blog
A
About on SuperTechFans
Martin Fowler
Martin Fowler
M
MIT News - Artificial intelligence
Recent Announcements
Recent Announcements
D
DataBreaches.Net
B
Blog
博客园 - 【当耐特】
爱范儿
爱范儿
有赞技术团队
有赞技术团队
P
Proofpoint News Feed
WordPress大学
WordPress大学
小众软件
小众软件
Apple Machine Learning Research
Apple Machine Learning Research
I
InfoQ
Engineering at Meta
Engineering at Meta
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
Last Week in AI
Last Week in AI
Microsoft Azure Blog
Microsoft Azure Blog
雷峰网
雷峰网
量子位
G
Google Developers Blog

Business News Today: Latest Business News, Finance News

Markets’ dilemma: Trust the bark or wag of oil prices The sector call illusion Bandu’s Blockbusters For April 12, 2026 Mastering Derivatives: Does Lag Impact Effectiveness Of OI? Who Am I? April 12, 2026 Index Outlook: Rising From Dire Straits US Market Outlook: Gaining Strength Bullion Cues: Gold And Silver Futures Face Barrier F&O Tracker: Tentative Shift In Trend F&O Strategy: Buy L&T Put Maruti Suzuki to launch 4 EVs by 2031 India Inc flags surge in cost of packaging raw material, seeks relief measures India-flagged LPG tanker Jag Vikram crosses Strait of Hormuz after US-Iran ceasefire Muted pricing power, rising costs to curb benefits of demand in cement sector: HDFC Securities Iran's new supreme leader Mojtaba Khamenei has severe and disfiguring wounds, sources say No road tax, registration fees for electric vehicles priced up to ₹30 lakh till March 2030: Delhi’s draft EV policy Central Railway to run four special local trains for Ambedkar Jayanti West Asia tensions push up costs for India; further impact hinges on stability: Report ED initiates fresh raids against former Bengal minister Chatterjee in teacher recruitment scam Election Commission reverses Mittal’s DVAC posting, appoints him DGP, TN Armed Police Israel and Lebanon are expected to hold talks. Here’s what to know US, Iran set for peace talks but doubts emerge over Lebanon, sanctions Cotton Association revises output estimates for 2025-26 up at 324 lakh bales of 170 kg each Orbicular gets USFDA’s tentative nod for generic Semaglutide Injection in partnership with Apotex Malls, high-streets in NCR clock 45% rise in leasing of retail spaces in Jan-Mar: C&W FIIs pull ₹28,375 crore in five sessions; domestic buyers cushion fall as indices post best week in months Nifty and Bank Nifty Prediction for the week 13 Apr’26 to 17 Apr’26 by BL GURU Proposed Trump arch in Washington DC includes winged figure, eagles, lions and gold inscriptions 'Ladakh' replaces 'Jammu and Kashmir' in Aadhaar records for UT residents Misri ends US trip with focus on civil nuclear cooperation and LPG exports
Gujarat regulator holds right-of-way obstruction can qual...
M Ramesh · 2026-06-23 · via Business News Today: Latest Business News, Finance News

In an important ruling, the Gujarat Electricity Regulatory Commission (GERC) has held that project delays arising from right-of-way (RoW) issues can, in certain circumstances, qualify as force majeure — events beyond the reasonable control of a project developer. The implication is that a developer may be granted an extension of project timelines without attracting delay penalties.

Hearing a dispute between renewable energy developer Juniper Green and state-owned power utility Gujarat Urja Vikas Nigam Ltd (GUVNL) over delays in the commissioning of a 50 MW wind project, GERC accepted Juniper’s plea for relief, though for fewer days than the company had sought.

Juniper had claimed force majeure protection on eight grounds, including RoW-related difficulties. The Commission rejected the other seven claims.

The renewable energy industry, particularly the wind sector, has long complained that RoW issues have evolved beyond demands for fair compensation by landowners, mostly farmers, to what developers describe as extortion backed by local power brokers. Such disputes frequently escalate into law-and-order problems. The Juniper Green case illustrates the challenge. The situation became serious enough for the company to seek police protection.

GERC observed that the company “could not proceed smoothly without police protection for approaching the project site” and noted that this “cannot be equated with an ordinary commercial dispute or routine land-related difficulty that a developer is expected to manage.”

At the same time, the Commission stressed that not every local objection would constitute force majeure. Developers are expected to plan for land acquisition, access and logistics issues. “However, where access to the project site or execution of works is obstructed due to local resistance, and the developer is compelled to seek police protection, the matter assumes a different character,” GERC said.

The Commission also cited an earlier case involving Shivman Renewable Energy Pvt Ltd, where similar relief was granted for delays caused by local resistance and RoW difficulties.

The ruling could have significant implications for renewable energy projects. Developers facing unreasonable resistance may be able to seek police intervention and subsequently rely on such evidence to support claims for extensions of project schedules and relief from delay penalties.

The issue is particularly relevant for India’s wind sector, which installed a record 6.05 GW of new capacity in 2025-26. Industry leaders expect the momentum to continue. Girish Tanti, Chairman of the Indian Wind Turbine Manufacturers Association (IWTMA), has said annual installations could exceed 8 GW this year.

India currently has 56.8 GW of installed wind power capacity and aims to reach 100 GW by 2030. Union Minister for New and Renewable Energy Pralhad Joshi has expressed the ambition of achieving the milestone even earlier.

But right-of-way issues continue to stand in the way.

Published on June 23, 2026