惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

D
DataBreaches.Net
IT之家
IT之家
The Cloudflare Blog
Apple Machine Learning Research
Apple Machine Learning Research
WordPress大学
WordPress大学
N
Netflix TechBlog - Medium
阮一峰的网络日志
阮一峰的网络日志
P
Proofpoint News Feed
L
LangChain Blog
博客园 - Franky
美团技术团队
J
Java Code Geeks
Microsoft Security Blog
Microsoft Security Blog
博客园 - 叶小钗
小众软件
小众软件
Y
Y Combinator Blog
B
Blog RSS Feed
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
D
Docker
Hugging Face - Blog
Hugging Face - Blog
Jina AI
Jina AI
罗磊的独立博客
大猫的无限游戏
大猫的无限游戏
Vercel News
Vercel News

博客园 - xCvM

[导入]升级PJBlog2.5到PJBlog2.6 [导入]Google Maps应用大全 申请了codeday.com 打雷了...... 搬家倒计时...... Waiting for My Memory 终于回来了,爱姬 人算不如天算 视图\文档 - xCvM - 博客园 挂了~显示器 最后想出的标题:我们还年轻 GuiToolkit 1.1.5编译的一点说明 NASM中文手册{Paste} night weak Lantern Festival - xCvM Promotion FROM Annual Dinner TO Now Pain in heart
For Record
xCvM · 2006-03-29 · via 博客园 - xCvM

Meeting Minutes

Members: I`v`a`n` S`o, C`B L`o`w, C`Y C`h`a`n, B`e`e` A`y`e, C`h`e`n`M`i`n, X`i`a`o`F`a`n`g

(Add on comment from BI minutes in blue)

Operations (As attached):

1.       SMART will consider for the Mantis Scope per current productivity

[CB] - Will source 2 extra Mantis to cater Excel req (1 for P/IR and 1 for QA/QC)

2.       SAP for Plant 25, it is suggested to handle by Bee Aye. C`B` L`o`w` will discuss with David Harkin.

[CB] - All P25 transaction will be done in Pg. I will draft out a flow later. For interim until mid/end April, CY Chan will holding the responsibility

3.       Monthly forecast, need window to provide the quantity and period of time.

[CB] - Maggie/Halle will be providing these info

4.       Materials planning, deadline & frequency to provide.

[CB] - Maggie/Halle as single point of contact window between Smart and Excel. 

Joey will be the contact point on the materials support as well as the dram shipment arrangement. 

5.   All material to Excel will be send to HK (including PCB) to eliminate future custom issue to Excel.

       Bee Aye will coordinate with Maggie/Halle to ensure no shipment hold back due to Excel custom manual qty. (eg : CapA - manual btg 80K, plan ship 100K)

      Matl coordination, issuance of PO and those Joey is currently doing will not change. 

      We agreed that this month hic-up is mainly due to increase in demand and Excel could not react fast due to custom constrain.

6.   All ship plan, prod plan, NPI's will be coordinated between Bee Aye and Maggie/Halle.

7.   Chan to be free up from day to day task by early May for some other responsibility in China. Escalation or any help will still goes to Chan and follow by CB.

QA (As attached):

1.       PCB quality issue: SMART will consider for re-audit.

[CB] - Chan will work with Rajoo if that is needed.

Test (As attached):

1.       High Yield Loss for T3D400C38TS due to DRAM.

[CB] - We acknowledged that these are batch related and Excel has been doing a great job to contain it.

2.       Chenmin will provide the socket & motherboard requirement to CY Chan

3.    More role from Chen Min and Xiao Fang for RMA returns. (Direct deal if needed - Chan and Maggie to propose)

Others:

1.       NPI: Plan to start on mid-Apr for SODIMM, Registered DIMM & DDR II.

2.       SMART will provide the stencil & relevance information before NPI.

3.       C`B` L`o`w` will advice the stand for ROHS early April.

[CB] - BTU oven can cater for any memory module (only) RoHS build. At this point in time, there are no plan to upgrade it.

4.       HK Hub service: 1 head count + 300 sqf

-          2 layer rack

-          Job scope

-          Environment (CY Chan & Bee Aye will check out the temperature & humility next trip to Hk Hub)

[CB] - Ivan to provide quote and we will finalize the agreement with Janet.

[CB] - I hope this cover everything and this has been a great month for us to know Excel performance with 1 support crew.

Great JOB!!!

Best Regards,

C`B` L`o`w`

Sr. Manager