惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

腾讯CDC
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
博客园 - Franky
博客园_首页
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
IT之家
IT之家
The Cloudflare Blog
V
Visual Studio Blog
罗磊的独立博客
T
Tailwind CSS Blog
S
SegmentFault 最新的问题
Hugging Face - Blog
Hugging Face - Blog
V
V2EX
阮一峰的网络日志
阮一峰的网络日志
D
Docker
Last Week in AI
Last Week in AI
B
Blog RSS Feed
C
Check Point Blog
J
Java Code Geeks
The GitHub Blog
The GitHub Blog
有赞技术团队
有赞技术团队
博客园 - 聂微东
MongoDB | Blog
MongoDB | Blog
雷峰网
雷峰网

Interesting Engineering

US firm to scale laser-based nuclear fusion ‘breakthrough’ with new partnership Military Archives - Interesting Engineering World’s first non-nuclear lead-cooled reactor to generate electricity begins installation US scientists devise new process to turn sewage sludge into 99% pure natural gas US firm unveils submarine-hunting drone with 9,200-mile-range, 35 mph top speed Military Archives - Interesting Engineering Supercomputer finds lithium-titanium tweak to boost sodium-ion batteries for grids Lockheed Martin demonstrates vertical launch missile system for mobile drone defense China’s 1116 MWe Taipingling Unit 1 reactor goes online, set to generate 9bn kWh yearly ChatGPT Images 2.0 update combines reasoning, research, and design with 2K output US Navy tests plug-and-play laser system on USS Bush carrier, downs drones at sea China’s CATL reveals 621-mile EV battery, under-7-minute charging to challenge BYD US uses world’s first exascale supercomputer to model supernovae, fusion reactors AI and Robotics Archives - Interesting Engineering First-in-human study confirms safety of graphene-based brain interface Tesla’s Optimus humanoid robot greets runners, poses for photos at Boston Marathon Interlocking materials offer high strength and flexibility for robotics, infrastructure US redeploys 100,000-ton nuclear-powered aircraft carrier in Red Sea after repairs US scientists unveil concept for ‘world’s first neutrino laser’ to unlock breakthroughs New military tech can maintain communication in contested electronic warfare environments Got a dark personality? Psychologists can help you choose your career wisely Humidity boosts performance of 3D-printed nanogenerator instead of degrading it China demonstrates microwave beam that recharges drones in flight, continues power delivery Scientists run compact free-electron laser for eight hours, cracks FEL stability problem China’s PLA considers to use minelaying underwater drones to enforce Taiwan blockade: Report 1-ton sharks may struggle for survival in waters exceeding 62.6°F, study suggests US firm’s thorium nuclear fuel bundles move to manufacturing for commercial reactors Tesla hits 0% charge in remote Chilean desert as YouTuber uses hood-mounted solar Humanoid robot surpasses human world record in Beijing half-marathon, clocking 50:26 mins New method extracts maximum work from unknown quantum states using symmetry tricks
US delivers 135-ton ‘beating heart’ magnet for world’s la...
Aman Tripath · 2026-04-29 · via Interesting Engineering

The US ITER has completed the final deliveries for the central solenoid magnet at the International Thermonuclear Experimental Reactor (ITER) in Cadarache, France. The latest shipments included busbars and leads for electrical connections. 

The central solenoid is 18 meters (59 feet) tall and 4.25 meters (14 feet) wide, composed of six individual modules. Each module weighs more than 122.5 tonnes (135 tons) and is wound from 6 kilometers (3.7 miles) of niobium-tin superconducting cable. 

This component belongs to a magnetic system weighing 3,000 tonnes (3,300 tons) that interacts with nine vacuum vessel sectors. ITER, which is intended to become the world’s biggest nuclear fusion reactor, targets 500 MW of power for 400 seconds with 50 MW of heating power. It is reported that an additional 300 MWe of electricity input may be required for its operation.

The 15-year manufacturing project was conducted at the General Atomics Magnet Technologies Center in Poway, California. Each module required over two years for fabrication and testing. 

On-site assembly and integration of ITER project

To manage technical risks, the project included a seventh spare module. Earlier in 2025, US ITER delivered a 60-foot-tall exoskeleton support structure designed to stabilize the magnet against the forces it generates. 

This structure surrounds the superconducting magnet at the center of the fusion machine, which also utilizes toroidal field coils, poloidal field coils, and correction coils.

Assembly is in progress at the ITER site under the direction of the ITER Organization, and five of the six modules are currently stacked in the assembly hall. The final module, which arrived in September, is scheduled to be added to the stack later in 2026. 

Once stacking is complete, a compression structure will apply downward precompression to the module stack. Technical support for this phase is provided through an agreement with the US ITER project team based at the Oak Ridge National Laboratory.

The central solenoid will remain on its platform in the Assembly Hall until the vacuum vessel sector modules have been installed. It will then be moved into the center of the tokamak pit. The magnet induces the magnetic flux change needed to initiate the plasma and maintain the plasma current during the burn time. 

Demonstrating the feasibility

Kevin Freudenberg, US ITER Interim Project Director, stated that the completion of the magnet demonstrates the capacity of the United States to design and deliver technical fusion systems.

“Congratulations to the entire team who contributed, including those here at Oak Ridge National Laboratory who led the work, and our suppliers who fabricated critical components,” Freudenberg concluded.

ITER is an international collaboration to build a tokamak fusion device to demonstrate fusion as a carbon-free energy source. While the facility requires external electricity for operation, it aims to prove the technical feasibility of fusion power. The project intends to show that a fusion reaction can be sustained to produce a net gain in energy. 

The completed central solenoid is the primary component for generating the required plasma current. As an experimental device, ITER will not generate electricity for the commercial grid.

The Blueprint

Get the latest in engineering, tech, space & science - delivered daily to your inbox.

An active and versatile journalist and news editor. He has covered regular and breaking news for several leading publications and news media, including The Hindu, Economic Times, Tomorrow Makers, and many more. Aman holds expertise in politics, travel, and tech news, especially in AI, advanced algorithms, and blockchain, with a strong curiosity about all things that fall under science and tech.