惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

H
Help Net Security
腾讯CDC
爱范儿
爱范儿
Google DeepMind News
Google DeepMind News
V
V2EX
Blog — PlanetScale
Blog — PlanetScale
Engineering at Meta
Engineering at Meta
GbyAI
GbyAI
量子位
F
Fortinet All Blogs
G
Google Developers Blog
T
The Blog of Author Tim Ferriss
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
Hugging Face - Blog
Hugging Face - Blog
Last Week in AI
Last Week in AI
T
Tailwind CSS Blog
J
Java Code Geeks
S
SegmentFault 最新的问题
D
Docker
博客园 - 司徒正美
The GitHub Blog
The GitHub Blog
Jina AI
Jina AI
M
MIT News - Artificial intelligence
博客园 - 【当耐特】

Latest from TechRadar in Pro

VodafoneThree gets Ofcom approval to bring satellite connectivity to your smartphone Is this the tipping point for AI at work? New Gallup survey finds half of all US employees now use it in some way 'Every Apple user needs to know about this nasty scam': Fake warnings tell users their iCloud data will be… 'Makes it even more disappointing': Microsoft backs fossil fuel big time with $7 billion deal in race for AI… 'Maybe it’s not science fiction': Solar panels are causing rainwater to fall in one of the driest places… Maine becomes first US state to pass data centre construction ban Dozens of WordPress plugins hijacked to target thousands of sites Drone-killing laser weapons greenlit for use in US airspace – FAA and Defense Department say high-energy weapons are ‘ready to protect all air travelers from illicit drone use’ despite airspace restrictions and friendly-fire incidents 'We are currently being extorted' — crypto giant Kraken says it is facing extortion attack, here's… I tried 7 free MTD software – now I've ranked my top picks as a freelancer Jackery McGraw Hill becomes latest to see its Salesforce data hacked Looking for a new PC? Now might be great time to upgrade, as Gartner figures claim shipments are rising — while… The new engineering playbook: how AI design copilots are reshaping product development Farewell Surface Hub — Microsoft kills off its super-sized touchscreen displays, but you might still be able to get one if you act fast 'We have no interest in patient data in the UK': Palantir UK head defends record as criticisms rise Amazon’s new AI Bio Discovery tool can provide ‘every researcher’ with ‘lab-in-the-loop drug discovery’ – 40+ AI biology models can filter 300,000 novel antibody candidates down to the top results for testing in just weeks Over 100 Chrome Web Store extensions found stealing user data from thousands of accounts Europe wants tech sovereignty but is this realistic? Enterprise AI governance cannot live in a prompt. So where is the safety net? Why 2026 is the year of flexibility without friction: solving the multi-platform crisis OpenAI reveals its Mythos rival designed for cybersecurity pros When cyberattacks are inevitable, recovery becomes the strategy Closing the cloud complexity gap LaLiga uses AI to fight illegal streaming that costs its clubs $800m a year Intel and Google expand long-term chip partnership to power AI systems 'Chatbots respond not just to what you ask, but how you ask it': Report finds AI agents might be sucking up to… 'Smartphones have physical limitations': Report explains why AI is kickstarting a billion-dollar hardware arms… 'I’m pretty sure actually we really do not need to work for five days' Zoom CEO calls for end of traditional work schedules — says 3-day working week should become the norm 'It's more common than you think': Experts reveal how hackers are trying to hijack your inbox with these…
A $1.6 trillion fighter program is still struggling with ...
https://www.techradar.com/sg/author/efosa-udinmwen · 2026-06-22 · via Latest from TechRadar in Pro
F-35 fighter jet
(Image credit: Euronews)

  • Only one in four F-35s achieved full mission capability
  • Mission capable rates fell sharply between 2021 and 2025
  • Software delays continue affecting readiness across newly delivered aircraft

The Pentagon's F-35 fighter fleet continues to face readiness challenges despite years of investment, modernization efforts, and sustained contractor support, as a US Government Accountability Office (GAO) report found only 25% of the aircraft were fully mission capable during fiscal 2025.

According to the GAO, the fleet's mission-capable rate declined from 67% in fiscal 2021 to 44% in fiscal 2025.

The fully mission-capable rate, measuring aircraft able to perform all assigned missions, dropped from 38% to 25% during the same period.

Readiness declines despite billions spent on sustainment efforts

The findings raise questions about a program expected to cost ∼$1.6 trillion in lifetime US sustainment expenses while serving as the backbone of American air power.

US Air Force officials attributed part of the deterioration to software delays affecting newly delivered aircraft, alongside corrosion concerns and persistent shortages of replacement components.

The report described the F-35 as the Defense Department's most expensive weapons program while noting that performance goals remain unmet.

More than 800 F-35s are currently operated by the Pentagon, with plans to acquire roughly 1,700 additional jets by the mid-2040s.

Sign up to the TechRadar Pro newsletter to get all the top news, opinion, features and guidance your business needs to succeed!

Meanwhile, the Joint Program Office launched the Global Support Solution Reset in June 2025 to improve readiness and reverse years of declining availability.

Program officials established ambitious objectives under the initiative, seeking an 80% mission capable rate and a 65% fully mission-capable rate by 2030.

Achieving those goals is expected to require an additional $13.7 billion through fiscal 2031 beyond previous planning assumptions.

Only around $2.2 billion is directly associated with the reset initiative, while about $11.5 billion covers sustainment requirements exceeding earlier budget projections.

GAO warned that readiness levels could continue deteriorating before meaningful improvements emerge.

Internal program documentation reviewed by auditors indicated measurable gains may not appear until late 2026 or later.

The report also noted the Joint Program Office will depend on industry partners to deliver more than $7 billion in materials despite ongoing manufacturing limitations.

Incentive payments and supply shortages remain under scrutiny

A 2025 Lockheed Martin study identified 48 components that suppliers cannot currently manufacture in sufficient quantities.

Those shortages include aircraft canopies, which GAO has repeatedly identified as a major contributor to grounded fighters.

Auditors also projected that by the mid-2030s, military services could face an annual sustainment shortfall of roughly $1.2 billion.

The report examined contractor incentive payments and concluded that readiness-focused rewards frequently failed to produce expected outcomes.

Between 2020 and 2023, Lockheed Martin received more than $114 million from ∼$269 million in available incentive fees, even as readiness measures generally stagnated or declined.

In 19 of 39 performance periods, recorded readiness figures were adjusted upward due to factors deemed outside contractor control.

GAO further found inconsistent documentation surrounding incentive calculations and payment tracking practices.

Since 2014, auditors have issued 46 sustainment recommendations concerning the F-35 program, although only 14 had been implemented by March 2026.

That 30% implementation rate, spanning more than a decade of oversight, suggests the Pentagon's appetite for acting on independent findings remains limited at best.

Via Defense News


Google logo on a black background next to text reading 'Click to follow TechRadar'

Follow TechRadar on Google News and add us as a preferred source to get our expert news, reviews, and opinion in your feeds.


Efosa has been writing about technology for over 7 years, initially driven by curiosity but now fueled by a strong passion for the field. He holds both a Master's and a PhD in sciences, which provided him with a solid foundation in analytical thinking.