惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

B
Blog
D
Docker
J
Java Code Geeks
腾讯CDC
Blog — PlanetScale
Blog — PlanetScale
G
Google Developers Blog
M
MIT News - Artificial intelligence
L
LangChain Blog
T
The Blog of Author Tim Ferriss
P
Proofpoint News Feed
MyScale Blog
MyScale Blog
博客园 - Franky
GbyAI
GbyAI
Hugging Face - Blog
Hugging Face - Blog
aimingoo的专栏
aimingoo的专栏
Last Week in AI
Last Week in AI
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
博客园 - 聂微东
N
Netflix TechBlog - Medium
B
Blog RSS Feed
Y
Y Combinator Blog
阮一峰的网络日志
阮一峰的网络日志
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
Google DeepMind News
Google DeepMind News

Ars Technica - All content

Pentagon wants $54B for drones, more than most nations’ military budgets Mozilla: Anthropic's Mythos found 271 security vulnerabilities in Firefox 150 Supreme Court arguments make it clear that FCC fines are "nonbinding" Silo S3 teaser hints at the wasteland's origins Framework's CEO on the RAM crisis and creating a "MacBook Pro for Linux users" Florida probes ChatGPT role in mass shooting. OpenAI says bot "not responsible." Report: Meta will train AI agents by tracking employees' mouse, keyboard use Microsoft removes Call of Duty from Game Pass, lowers subscription pricing Framework Laptop 13 Pro is a major overhaul for the modular, upgradeable laptop Framework Laptop 16 upgrades make it look less like an unfinished prototype Internal emails show how Amazon raises prices across the Internet, lawsuit says Anthropic gets $5B investment from Amazon, will use it to buy Amazon chips CATL's new LFP battery can charge from 10 to 98% in less than 7 minutes AMD Ryzen 9 9950X3D2 Dual Edition review: Tons of cache for tons of dollars What's the deal with spacesuits for the Moon? Will they be ready in time? Loneliness in older adults can often lead to memory impairment Contrary to popular superstition, AES 128 is just fine in a post-quantum world Pentagon pulls the plug on one of the military's most troubled space programs John Ternus will replace Tim Cook as Apple CEO Blue Origin's rocket reuse achievement marred by upper stage failure I’ve fired one of America’s most powerful lasers—here’s what a shot day looks like Great white sharks are overheating US-sanctioned currency exchange says $15 million heist done by "unfriendly states" Man with @ihackedthegovernment Instagram account tells judge, “I made a mistake" Trump picks qualified, normal health leader to head CDC; experts still cautious $25,000 buys plenty of used EVs: Here are some options Satellite and drone images reveal big delays in US data center construction Amazon won’t release Fire Sticks that support sideloading anymore Ridley Scott's post-apocalyptic The Dog Stars drops first trailer Artemis II pilot talks about what it was really like to fly and land in Orion
Blue Origin certainly has ambitious launch targets for Ne...
Eric Berger · 2026-05-01 · via Ars Technica - All content

Earlier this week, Blue Origin posted a job opportunity for a “senior manager” to oversee tank fabrication for “Quattro,” and the description contained some intriguing information.

“As part of a hardworking team of specialists, technicians, and engineers you will be the Senior Manager of Gen 2.0 Tank Fabrication, and will own the production execution of the most structurally complex and schedule-critical subsystem on the vehicle—the propellant tank,” the job posting states.

Quattro is the company’s nickname for a more powerful upper stage for the New Glenn rocket, which will feature four BE-3U engines instead of the two currently powering the booster. Blue Origin revealed plans for this more powerful variant of New Glenn, 9×4 (nine first stage engines, and four upper stage engines), last November.

It is possible this rocket, significantly larger than the 7×2 variant currently flying and necessary for the company’s lunar ambitions as part of NASA’s Artemis program, could make its debut next year.

Get ready to ramp production

There is some additional information in the posting that underscores the ambition Blue Origin is chasing with its New Glenn vehicle, which has launched three times since its initial flight in January 2025.

The job responsibilities include executing a “rate ramp”—which is to say, a production rate—of 12 per year currently to 60 per year by the third quarter of 2028, followed by a production rate of 100 second stages annually by 2029. A company official told Ars that these production targets are accurate.