惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

雷峰网
雷峰网
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
大猫的无限游戏
大猫的无限游戏
Google DeepMind News
Google DeepMind News
V
V2EX
T
The Blog of Author Tim Ferriss
H
Hackread – Cybersecurity News, Data Breaches, AI and More
Hugging Face - Blog
Hugging Face - Blog
Stack Overflow Blog
Stack Overflow Blog
I
InfoQ
博客园_首页
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
Last Week in AI
Last Week in AI
Recent Announcements
Recent Announcements
Vercel News
Vercel News
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
T
Tailwind CSS Blog
美团技术团队
Martin Fowler
Martin Fowler
宝玉的分享
宝玉的分享
Blog — PlanetScale
Blog — PlanetScale
GbyAI
GbyAI
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
J
Java Code Geeks

TechWire Asia

Microsoft to deploy AMD Helios AI systems on Azure Microsoft ERP Implementation Partners Roundup: Which Is Best For Your Business? Semiconductor talent retention now comes with a price tag, and it keeps climbing AI token usage is not productivity. Here's what to measure instead Oracle brings governed AI agents to Fusion Applications Nvidia expands Japan AI infrastructure and robotics push AI Appreciation Day 2026 puts trust and governance in focus NVIDIA pours its full stack into Japan. The flip side of its China lockout? Malaysia's digital regulations are becoming a real cost for its startups Malaysia's AI data center vision: How EdgeConneX is building for the future Southeast Asia tech funding doubled to $7.4 billion. One company took most of it SK Hynix's Nasdaq listing raises $26.5 billion to fund Korea's AI memory expansion OpenAI launches GPT-5.6 for coding, cyber and science Meta rolls out Muse Image AI model for Instagram, WhatsApp, and advertisers Malaysia businesses face AI and password cybersecurity risks How AI workloads will test APAC mobile networks Enterprise AI costs don't have to spiral, argues ManageEngine Microsoft launches $2.5B Frontier Company for enterprise AI FIFA World Cup: How To Win Fans in APAC With Technology Kanga enters a new phase of global growth and launches Kanga Global U Mobile completes migration to own ULTRA5G network after DNB exit Anthropic Claude models launch in Microsoft Foundry on Azure Asia built the AI infrastructure boom. The BIS just flagged who's exposed if it stalls. Why Apple is lobbying Washington to buy China’s memory chips Nvidia-backed Firmus plans 170,000-GPU Batam AI data centre Taiwan robot makers march into humanoid systems IBM claims world’s first sub-1 nm chip technology using nanostack design Can Alibaba bridge Malaysia’s SME talent gap via agentic AI for business? Huawei’s new tech explains why mobile AI network tech is no longer optional Apple-Intel chip deal faces years-long production timeline
Vertiv ramps up manufacturing in Johor's tightening data ...
Dashveenjit Kaur · 2026-07-01 · via TechWire Asia
  • Vertiv is manufacturing power and cooling gear in Johor to meet Asia’s AI demand, as the Johor data centre market becomes more selective.
  • The plant is in phase one, operational and shipping since the first quarter, with full capacity due in 2027.

Vertiv has opened its first Southeast Asian manufacturing base in Johor, moving power and cooling production into the region to serve fast-rising AI demand, even as the Johor data centre market it is scaling into becomes more selective about approvals. The plant in Senai, which Vertiv unveiled on July 1, is the company’s answer to a shift it can already see coming in its customers’ racks.

Paul Churchill, Vertiv’s vice president and general manager for Asia, said the company works closely with Nvidia on power and cooling ahead of each chip release, and that rack densities are climbing from 10kW toward 100kW and beyond. At those levels, he said, you physically cannot get enough power into a rack without moving to higher-voltage 800V DC designs, which are appearing first in the US and are expected to follow in Asia. 

Building that gear inside the region, rather than shipping it in, is how Vertiv intends to keep pace. The roughly 236,000 sq ft facility makes the CoolChip coolant distribution units that liquid-cooled AI racks rely on, along with prefabricated power and SmartRun systems that Vertiv says can cut on-site deployment time by up to 85%. 

Andrew Whall, its vice president of operations and service operations for Asia, said the plant has been operational since the first quarter and has been shipping units of its XDU liquid-cooling line for several months. It is running phase one now, with later phases adding a new liquid-cooling line and larger SmartRun builds, and full technical capacity expected around the second or early third quarter of 2027. 

Vertiv would not disclose its investment, with Churchill calling the plant the first of further stages in Johor. The site is targeting up to 500 skilled jobs by the time it is fully operational. Churchill told Tech Wire Asia separately that between 100 and 150 people are on the floor today, and that about 98% of them are Malaysian. 

He said Vertiv had expected to bring in labour from outside, as other manufacturers in the region have done, but local recruitment drives filled the roles instead. The first hiring preference, he said, is local, with skill-based the deciding factor.

Why the region, and why now

The pull to manufacture locally comes down to speed. Churchill said customers want shorter lead times, and that shipping products from outside the region carries delay and cost risk, pointing to the freight disruptions of the past couple of years. Malaysia met Vertiv’s criteria on connectivity and local talent, he said, with support from state agencies smoothing the setup. Serving the Asian market from within Asia, at the scale demand now calls for, was the logic.

A Johor data centre market that is getting choosier

Vertiv is scaling into a market that has started to tighten. A representative from the Malaysian Investment Development Authority (MIDA) said Malaysia has approved 52 data centre projects, of which 17 are operational, with the rest at various stages of construction and approval. Invest Johor said the state has grown more selective on new data centres, weighing their power and water demands against other sectors it wants to grow, and pressing incoming projects to commit to local suppliers. 

Johor has carried the bulk of the country’s data centre buildout, and the strain on its grid and water supply is what the tighter gate is meant to manage. None of that appears to worry Vertiv. Asked about warnings that hyperscalers are trimming capital spending, and whether AI infrastructure is in a bubble, Churchill said it was not something he could really comment on, but that customer demand remained “extremely healthy,” with a three-to-five-year investment runway across Asia.

Vertiv is building for demand and expects to keep climbing. What Johor is now weighing is how much of that demand it can afford to power and cool.

Want to experience the full spectrum of enterprise technology innovation? Join TechEx in Amsterdam, California, and London. Covering AI, Big Data, Cyber Security, IoT, Digital Transformation, Intelligent Automation, Edge Computing, and Data Centres, TechEx brings together global leaders to share real-world use cases and in-depth insights. Click here for more information.

Tech Wire Asia is powered by TechForge Media. Explore other upcoming enterprise technology events and webinars here.