惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

酷 壳 – CoolShell
酷 壳 – CoolShell
G
Google Developers Blog
V
V2EX
美团技术团队
H
Help Net Security
月光博客
月光博客
爱范儿
爱范儿
Engineering at Meta
Engineering at Meta
The Cloudflare Blog
U
Unit 42
大猫的无限游戏
大猫的无限游戏
Recent Announcements
Recent Announcements
A
About on SuperTechFans
博客园 - Franky
The GitHub Blog
The GitHub Blog
N
Netflix TechBlog - Medium
人人都是产品经理
人人都是产品经理
博客园 - 司徒正美
MyScale Blog
MyScale Blog
B
Blog
雷峰网
雷峰网
Y
Y Combinator Blog
云风的 BLOG
云风的 BLOG
T
The Blog of Author Tim Ferriss

Science News, Space News, ISRO, NASA News & Updates | The HinduBusinessLine

Ancient marine reptile was a fearsome “T. rex of the sea”, study finds Think it's hot now? The next five years will smash records: UN Climate change fuelling growth of antibiotic-resistant Salmonella: Study Red Balloon launches India’s first stratospheric super-pressure balloon NASA unveils 3-phase $20-billion plan for permanent moon base Space start-up AnduraX to conduct ‘drop test’ for reusable spaceplanes India can boost Ebola vaccine and antibody development: Soumya Swaminathan ICMR launches major biomedical innovation and technology transfer platform China to send astronaut on year-long space mission as it targets 2030 moon landing China's new lunar mission to conduct environment and resource surveys of Moon’s south pole Gujarat, Tamil Nadu to get new technical facilities for space sector manufacturing SpaceX sets Mars vision with 1 million population target for Musk incentives SpaceX invests over $15 billion in Starship rocket development, SEC filing reveals SpaceX targets 10,000 rocket launches per year within five years, FAA says Strand Life Sciences marks a research milestone that aids drug discovery AI Meets Agriculture: Indian scientists creates gene editor for crops Pune scientists develop DME fuel to reduce India’s LPG import dependence With AI, science is borderless Global space-tech major ICEYE to launch satellite production in India Scientists find climate change is reducing oxygen in rivers worldwide WOG Tech sets up research centre IIT Bombay launches indigenous carbon capture and storage pilot facility David Attenborough turns 100 amid global tributes and BBC celebrations James Webb Telescope reveals barren rocky exoplanet beyond solar system Trump releases classified UFO files and Apollo mission records India seeks greater role in global international space norms Newer weight loss drugs may alter brain's reward circuit, impact how one experiences pleasure: Study Skyroot Aerospace becomes unicorn after $60 million funding ahead of Vikram-1 launch India and Japan sign quantum technology and healthcare cooperation agreements FICCI, PSA office join hands to drive deep tech and innovation in India
NASA shakes up moon mission with more tests, scrapped upg...
By Bloomberg · 2026-02-28 · via Science News, Space News, ISRO, NASA News & Updates | The HinduBusinessLine
NASA Administrator Jared Isaacman speaks about the Artemis program at a press conference at the Kennedy Space Center in Cape Canaveral, Florida, U.S., February 27, 2026

NASA Administrator Jared Isaacman speaks about the Artemis program at a press conference at the Kennedy Space Center in Cape Canaveral, Florida, U.S., February 27, 2026 | Photo Credit: JOE SKIPPER

NASA is shaking up its Artemis mission to the moon, canceling a multibillion-dollar Boeing Co. upgrade to the centerpiece SLS rocket and adding another test flight to a program beset by delays and cost overruns. 

The changes announced on Friday mean that NASA is swapping the actual moon landing for an additional mission closer to Earth — while insisting the 2028 deadline for a lunar touchdown remains unchanged. 

“We need to move faster, eliminate delays and achieve our objectives,” said Jared Isaacman, NASA’s Administrator and a billionaire former fintech executive.

Issacman’s revamp, a mere two months into his tenure, comes as NASA faces criticism over mismanagement and spiraling costs in its effort to put humans back on the moon for the first time in more than 50 years.

Artemis is estimated to have cost roughly $93 billion so far, and the latest mission that aims to take a crew around the moon has been delayed by weeks — and possibly months.

Artemis III, which was supposed to be the moon landing and is now pulled forward to 2027, will see Boeing’s Space Launch System rocket launch a crew aboard Lockheed Martin Corp.’s Orion capsule. The craft will then dock with one or two of the commercially supplied landers in Earth orbit, NASA said. Artemis IV will land a crew on the moon a year later. 

NASA said the goal of the changed sequence is to fly more frequently in order to counteract one of the biggest criticisms of Artemis: the slow development pace of its SLS rocket. 

But after years of Boeing’s SLS rocket missing deadlines, it’s unclear if the company will actually be able to meet this accelerated pace and if NASA can actually pull up Artemis III in the way it envisions.

The overall mission has largely been set in stone since President Donald Trump’s first term. 

The numerous setbacks and a complicated architecture that marries technology supplied by multiple companies has fueled doubts that NASA will meet its 2028 target in a moon race against a resurgent China.

Boeing’s SLS rocket has a low launch rate, with years passing between flights. That can create more risk, according to NASA, as engineers and flight operators are unable to keep their launch skills sharp. 

NASA plans to find an alternative to Boeing’s Exploration Upper Stage, or EUS, a much more powerful upper portion of the SLS slated to debut on the rockets’ fourth launch. NASA would not clarify if it was canceling the EUS contract or which company would manufacture a new stage.

“We’re not talking about contractual issues,” Amit Kshatriya, NASA’s associate administrator, told reporters. 

While Boeing will still build the core portion of the SLS rocket, a potential loss of the upper-stage work would mark the latest setback for the storied aerospace company. Boeing’s EUS has come under significant criticism for being behind schedule and its ballooning cost, which NASA’s Inspector General says will hit nearly $2.8 billion through 2028.

“As NASA lays out an accelerated launch schedule, our workforce and supply chain are prepared to meet the increased production needs,” Steve Parker, the top Boeing space division executive, said in a statement.

The agency has tasked Elon Musk’s SpaceX and Jeff Bezos’ Blue Origin to build landers to ferry humans to and from the moon. With the addition of another mission, the now repurposed Artemis III flight will test rival lunar landers built by SpaceX and Blue Origin in Earth orbit, a strategy aimed at reducing risks.

Under the previous sequence, the landers would have had very little time to do in-space tests before carrying people for the first time. NASA recently called on SpaceX and Blue Origin to speed up development of their lander, with the clock now ticking to produce vehicles that will be capable of docking with Artemis III by next year.

More stories like this are available on bloomberg.com

Published on February 28, 2026