惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
Jina AI
Jina AI
Hugging Face - Blog
Hugging Face - Blog
博客园 - 三生石上(FineUI控件)
博客园 - 【当耐特】
大猫的无限游戏
大猫的无限游戏
IT之家
IT之家
宝玉的分享
宝玉的分享
WordPress大学
WordPress大学
有赞技术团队
有赞技术团队
Apple Machine Learning Research
Apple Machine Learning Research
酷 壳 – CoolShell
酷 壳 – CoolShell
阮一峰的网络日志
阮一峰的网络日志
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
爱范儿
爱范儿
小众软件
小众软件
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
The Cloudflare Blog
S
SegmentFault 最新的问题
博客园 - Franky
博客园_首页
T
Tailwind CSS Blog
雷峰网
雷峰网
罗磊的独立博客

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
NIT-C report on Brahmpuram legacy waste likely on May 11
2026-05-09 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
The kochi Corporation has so far spent ₹118.30 crore on biomining.

The kochi Corporation has so far spent ₹118.30 crore on biomining. | Photo Credit: SPECIAL

The National Institute of Technology-Calicut (NIT-C) is likely to submit its report on the volume of legacy waste remaining to be bio-mined at the Kochi Corporation’s Brahmapuram dumping yard on Monday (May 11, 2026).

The agency, initially engaged by the previous Left Democratic Front (LDF) council, was reappointed by the newly elected United Democratic Front (UDF) governing committee earlier this year. In its earlier assessment during the LDF tenure, the NIT-C had found an additional 1.46 lakh tonnes of legacy waste over and above the 7 lakh tonnes initially calculated for biomining.

The NIT-C was re-engaged after the Opposition LDF contested Mayor V.K. Minimol’s statement in January, following her visit to Brahmapuram, that 2.50 lakh tonnes of waste remained to be bio-mined. The Opposition alleged that the figure included scientifically capped waste, which does not require biomining, and questioned how the estimate was reached when officials had confirmed that only 1.43 lakh tonnes remained.

Since being reappointed, the NIT-C has conducted a drone survey of the legacy waste site. “We are expecting the report on Monday. It will be placed before the council meeting scheduled for May 15,” said Ms. Minimol.

Just before the Assembly election notification, the UDF-led Corporation council granted Bhumi Green Energy an extension to complete biomining of the remaining waste. The council claimed it had managed to reduce the per-tonne rate of biomining by ₹18 from the previously fixed ₹1,690 through intense negotiations, saving the Corporation around ₹60 lakh.

The Opposition LDF, however, alleged that norms were violated by assigning work without tender and council approval. It contested the extension agreement reached even before receiving the NIT-C’s report. LDF parliamentary party leader V.A. Sreejith warned of stiff protest when the Mayor’s advance approval comes before the council for ratification.

Ms. Minimol defended the extension, citing April-May as the most suitable period for biomining, since the tonnage of waste would increase during the monsoon. She added that the Corporation would pay the bill for the additional 1.46 lakh tonnes bio-mined by the company after securing council approval through a supplementary agenda.

Biomining, originally scheduled for completion within 16 months, had earlier been given a nine-month extension due to weather-related challenges and financial constraints. The Corporation has so far spent ₹118.30 crore on biomining.

Published - May 09, 2026 07:57 pm IST