惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
博客园 - Franky
T
Tailwind CSS Blog
Microsoft Azure Blog
Microsoft Azure Blog
The Cloudflare Blog
博客园 - 叶小钗
N
Netflix TechBlog - Medium
罗磊的独立博客
量子位
MyScale Blog
MyScale Blog
A
About on SuperTechFans
Blog — PlanetScale
Blog — PlanetScale
V
Visual Studio Blog
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
GbyAI
GbyAI
B
Blog
腾讯CDC
爱范儿
爱范儿
Recent Announcements
Recent Announcements
有赞技术团队
有赞技术团队
F
Fortinet All Blogs
雷峰网
雷峰网
G
Google Developers Blog
Google DeepMind News
Google DeepMind News

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Trinamool’s land policy delayed West Bengal border fencin...
2026-05-13 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
This image is used for representational purposes only.

This image is used for representational purposes only. | Photo Credit: The Hindu

One of the key reasons behind the delay in land acquisition to erect fences along the Bangladesh border in West Bengal was the policy followed by the former Trinamool Congress government, according to a 2023 affidavit filed by the Ministry of Home Affairs (MHA) in the Supreme Court.

The MHA had, through an affidavit, informed the Supreme Court that the West Bengal government had not adopted the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act (LARR Act), 2013, under which the government can take possession of any land needed for a public purpose.

Then Union Home Secretary Ajay Kumar Bhalla, in the affidavit, said, “The West Bengal Government follows a far slower, more complex Direct Land Purchase Policy even for national security projects such as border fencing. Due to the non-cooperation from the State government regarding resolving various issues of land acquisition, considerable delays have occurred in acquiring the necessary land, thereby impeding the timely completion of fencing in West Bengal along the Indo-Bangladesh border, which is a vital national security project.”

On May 11, soon after assuming power in the State for the first time, the Bharatiya Janata Party (BJP) government announced that it had decided to transfer land to the Border Security Force (BSF) within the next 45-days.

According to submissions made before the Calcutta High Court in January, the West Bengal Government had handed over 78 km of border land to the BSF over the past three years, while 121 km of border length was yet to be transferred. Of the 285.25 km border length required by the BSF across the nine districts, including Nadia, North 24 Parganas, Murshidabad, Malda, Dakshin Dinajpur, Darjeeling, Jalpaiguri, and Cooch Behar, the State Cabinet had given clearance for 256 km.

Data presented before the court showed that the land purchase, measuring around 269 acres along 48.49 km of border, had been completed but was yet to be handed over to the BSF. The purchase and acquisition of around 1,156 acres remained pending, the data further showed.

While hearing a public interest litigation, the Calcutta High Court asked the counsels of the State and the Union Government “regarding applicability and feasibility of acquisition by invoking Section 40 of the Act of 2013.”

Section 40 of the 2013 Act, “in cases of urgency,” enables the appropriate government to take possession of any land needed for a public purpose. The total length of the Indo–Bangladesh border in West Bengal is 22,16.7 km, out of which 1,647.696 km has already been covered by fence.

The MHA informed Parliament last year that of the remaining 569.004 km, which is yet to be covered by fence and other border infrastructure work, 112.780 km is non-feasible for fencing and 456.224 km is feasible for construction of fencing and related work.

Published - May 13, 2026 02:25 am IST