惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

量子位
F
Fortinet All Blogs
J
Java Code Geeks
Y
Y Combinator Blog
Stack Overflow Blog
Stack Overflow Blog
V
Visual Studio Blog
M
MIT News - Artificial intelligence
腾讯CDC
Last Week in AI
Last Week in AI
The Cloudflare Blog
酷 壳 – CoolShell
酷 壳 – CoolShell
Jina AI
Jina AI
Microsoft Security Blog
Microsoft Security Blog
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
P
Proofpoint News Feed
博客园 - 叶小钗
Recent Announcements
Recent Announcements
T
Tailwind CSS Blog
Engineering at Meta
Engineering at Meta
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
人人都是产品经理
人人都是产品经理
L
LangChain Blog
博客园 - 司徒正美
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Thammanam-Pulleppady Road: ₹93.89-cr. financial sanction ...
The Hindu Bureau · 2026-06-23 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

Financial sanction worth ₹93.89 crore has been granted for acquiring land for the Thammanam-Pulleppady Road, Minister for Public Works P.K. Basheer has said.

The project has already received administrative sanction of ₹100 crore, he said in response to a submission moved by Ernakulam MLA T.J. Vinod. The project is currently at the stage of publishing notification for land acquisition, the Minister said.

Mr. Basheer added that a detailed project report (DPR) was being prepared for the proposed 49.50-km Ernakulam Bypass connecting Angamaly and Aroor along the national highway. The National Highways Authority of India (NHAI) is taking necessary steps in this regard. The estimated cost of the project is ₹13,553.5 crore, including ₹6,183.4 crore for land acquisition and ₹6,551.1 crore for construction. The bypass is expected to ease traffic congestion on the Aluva Bypass.

Traffic studies conducted by the NHAI indicate that a majority of vehicles are likely to use the new Ernakulam Bypass once it becomes operational, thereby significantly reducing congestion on the Angamaly-Edappally stretch of NH-544. The alignment of the bypass has already been approved by the government. Mr. Basheer said he would discuss the project with the Union Minister for Road Transport and Highways on July 7.

He further said that land acquisition could be initiated as soon as the Ministry of Road Transport and Highways approves the DPR. He was responding to a submission moved by Aluva MLA Anwar Sadath in the Assembly.

The existing NH-544 stretch from Angamaly to Edappally is a four-lane road with a width of 25-30 metres. Further widening of the stretch is not possible due to urbanisation on both sides. The narrowness of the Marthandavarma Bridge along the route also contributes to traffic congestion. Mr. Basheer clarified that neither the government nor the NHAI had any proposal to construct a bridge or an elevated highway parallel to the Marthandavarma Bridge.

Published - June 22, 2026 10:24 pm IST