惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

GbyAI
GbyAI
Martin Fowler
Martin Fowler
I
InfoQ
腾讯CDC
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
爱范儿
爱范儿
Microsoft Security Blog
Microsoft Security Blog
Google DeepMind News
Google DeepMind News
D
DataBreaches.Net
云风的 BLOG
云风的 BLOG
F
Fortinet All Blogs
N
Netflix TechBlog - Medium
博客园 - 聂微东
Microsoft Azure Blog
Microsoft Azure Blog
D
Docker
博客园 - 三生石上(FineUI控件)
Y
Y Combinator Blog
博客园 - Franky
Engineering at Meta
Engineering at Meta
B
Blog
罗磊的独立博客
Apple Machine Learning Research
Apple Machine Learning Research
Jina AI
Jina AI
V
Visual Studio Blog

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Legislature panel to recommend grant of ₹ 1,250 crore to ...
The Hindu Bureau · 2026-05-27 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
T. Raghumurthy, chairman, Karnataka Legislature Committee on Public Undertakings, addressing presspersons in Mangaluru on Wednesday. 

T. Raghumurthy, chairman, Karnataka Legislature Committee on Public Undertakings, addressing presspersons in Mangaluru on Wednesday.  | Photo Credit: H.S. MANJUNATH

Chairman of Karnataka Legislature Committee on Public Undertakings T. Raghumurthy said here on Wednesday that the committee will submit an interim report to the government in July that Mangaluru needs ₹1,250 crore for upgrading and augmenting its underground drainage (UGD) infrastructure in the jurisdiction of Mangaluru City Corporation (MCC).

Speaking to presspersons ahead of a meeting of the committee, comprising both MLAs and MLCs as its members, the chairman said that the report will be tabled in the Monsoon Session of the legislature in July.

He said the officials concerned have told the committee that the fund required is to meet the demand for UGD infrastructure (such as network of underground drainage pipelines to be laid, wet wells and sewage treatment plants to be built) for the projected population of 8 lakh in the city by 2046.

Ravichandra Naik, MCC Commissioner, said that only 65% of the area under the corporation now has UGD network. There is a need to build 180 km of new UGD network and upgrade 185 km of network with associated facilities.

Udupi projects

Mr. Raghumurthy said that KUIDFC officials in Udupi have told the committee that three water supply projects taken up in Udupi city will be completed by January, 2027.

Of these, a project costing ₹106.92 crore taken up in 2018, from Asian Development Bank grant, will be over by September 30, 2026. This project has achieved 94% physical progress and 87.45% financial progress.

Another project taken up in 2019 under AMRUT scheme and costing ₹116.54 crore will be completed by December, 2026. It has achieved 91.64% physical progress and 91.33% financial progress.

The third project costing ₹50.80 crore taken up in 2021 with grants from Karnataka government will be over by January, 2027. The project has witnessed 93.04% physical progress and 88.91% financial progress, the chairman said, quoting officials.

MLCs Ivan D’Souza and Kishore Kumar Puttur and other members of the committee were present.

Published - May 27, 2026 07:56 pm IST