惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

V
Visual Studio Blog
量子位
大猫的无限游戏
大猫的无限游戏
Hugging Face - Blog
Hugging Face - Blog
S
SegmentFault 最新的问题
Blog — PlanetScale
Blog — PlanetScale
月光博客
月光博客
Google DeepMind News
Google DeepMind News
小众软件
小众软件
WordPress大学
WordPress大学
宝玉的分享
宝玉的分享
MongoDB | Blog
MongoDB | Blog
B
Blog RSS Feed
博客园 - Franky
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
B
Blog
博客园 - 聂微东
The GitHub Blog
The GitHub Blog
Recent Announcements
Recent Announcements
Y
Y Combinator Blog
Microsoft Security Blog
Microsoft Security Blog
雷峰网
雷峰网
Jina AI
Jina AI
酷 壳 – CoolShell
酷 壳 – CoolShell

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Sewage pollution of Cooum, groundwater depletion raise alarm
2026-05-14 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
Water from the Cooum eventually reaches the Chembarambakkam reservoir, one of the city’s major source.

Water from the Cooum eventually reaches the Chembarambakkam reservoir, one of the city’s major source. | Photo Credit: Special Arrangement

The mismatch between rapid urbanisation and lack of sufficient sewer infrastructure has threatened the relatively cleaner stretch of the Cooum river. Residents have raised concerns over persistent sewage pollution near the Putlur check dam, located 40 km from Chennai.

Residents of Manavala Nagar, Tiruvallur, said groundwater levels in the neighbourhood had taken a hit after portions of the riverbed were dried up for bridge construction as part of the Chennai Peripheral Ring Road project, a six-lane expressway.

Sewage pollution in the upper reaches of the river can also affect Chennai’s water source, as water diverted through the Puduchatram and Korattur check dams eventually reaches the Chembarambakkam drinking water reservoir.

Pointing out that water stored near the river’s checkdams was a pivotal source of groundwater recharge, residents said this has worsened sewage issues.

D. Anandakrishnan, a resident of Manavala Nagar, said “The entry of untreated sewage directly into the river, particularly near the dry riverbed, will worsen groundwater pollution and undermine efforts to store freshwater near check dams. We have been demanding that the dysfunctional Periyakuppam sewage treatment plant be upgraded to handle growing volume of sewage generated.”

The local body, which has sunk borewells along the river, also faced scarcity after water was pumped out for the bridge construction, he said.

Suresh Ramanathan, president, Manavala Nagar Residents Welfare Association, said “Groundwater has already depleted in areas like Vengathur, Putlur, and Manavala Nagar by a depth of 20 feet after the riverbed was dried up for the work. Temporary storage structures should be built in the upstream or downstream portion of the river to store water and avert water scarcity in the localities.”

Residents said several representations had been submitted seeking steps to arrest untreated sewage flow into the river and restore waterway as a groundwater source.

Officials of the Water Resources Department said a joint inspection was recently conducted with the Municipal Administration and Water Supply Department and the Tamil Nadu Pollution Control Board. The team has suggested that the sewage treatment plant’s capacity be increased to cater to the sewage generation of the rapidly urbanising Tiruvallur municipality.

While advanced soil biotechnology is being deployed to improve quality of treated sewage discharged into the river, the plant capacity was not inadequate. A report suggesting measures to mitigate sewage pollution in the river has been submitted to the Tiruvallur local body and district administration, officials said.

Noting that the work for the Chennai Peripheral Ring Road project across the river portion would not adversely impact groundwater, an official said the contracting firm had been advised to build a temporary bund downstream of the work site.

Published - May 14, 2026 12:23 am IST