惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

G
Google Developers Blog
阮一峰的网络日志
阮一峰的网络日志
博客园 - 聂微东
F
Fortinet All Blogs
H
Help Net Security
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
D
DataBreaches.Net
MyScale Blog
MyScale Blog
B
Blog
I
InfoQ
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
GbyAI
GbyAI
Google DeepMind News
Google DeepMind News
IT之家
IT之家
The GitHub Blog
The GitHub Blog
有赞技术团队
有赞技术团队
博客园_首页
L
LangChain Blog
V
V2EX
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
T
The Blog of Author Tim Ferriss
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
Microsoft Azure Blog
Microsoft Azure Blog
博客园 - Franky

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Jhansi’s Greenfield Industrial City project receives offi...
2026-06-02 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

A historic milestone has been achieved in the efforts being made by the Yogi government towards the economic and industrial transformation of the Bundelkhand region. The Ministry of Environment, Forest and Climate Change, Government of India, has officially granted environmental clearance to the ‘Greenfield Industrial City (BIDA Master Plan-2045)’ project of the Bundelkhand Industrial Development Authority (BIDA), Jhansi.

This mega project will be developed over an area of 253.33 square kilometres (62,599.20 acres), covering 33 rural areas of Jhansi tehsil. The project was classified under the Schedule of the Environmental Impact Assessment Notification, 2006. In line with the stringent standards prescribed for projects of this scale, BIDA completed the entire process in a time-bound and transparent manner.

The Expert Appraisal Committee of the Ministry examined the project’s framework on June 30, 2025, and the Ministry granted its first approval on July 20, 2025. To ensure participation of local citizens, a public hearing was held in Jhansi on December 22, 2025, under the chairmanship of the Additional District Magistrate.

A public notice for the hearing had been published in leading newspapers on November 20, 2025. The local public expressed broad support for the project during the hearing.

All environmental aspects, technical details and required modifications related to the project were reviewed in detail by the Expert Committee on March 5 and April 9-10, 2026. After finding all parameters satisfactory, the Committee recommended granting environmental clearance to the project.

Based on the suggestions of the Ministry of Environment and the Expert Appraisal Committee, the proposed land-use allocation under the revised Master Plan is as follows:

*Industrial Area (33.02%):* An area of 83.66 square kilometres has been reserved for industrial development, where industries related to agriculture and food processing, textiles, defence equipment, electronics, data centres and electric vehicles will primarily be established.

*Residential and Habitation Area (16.90%):* A total of 37.40 square kilometres has been earmarked for new residential areas, while 5.40 square kilometres has been designated for existing rural settlements.

*Green and Recreational Area (24.92%):* A total of 63.13 square kilometres has been preserved as a green area (green zone).

*Transport and Logistics (11.56%):* An area of 29.30 square kilometres has been allocated for the development of roads, rail infrastructure and logistics hubs.

*Commercial, Mixed and Other Uses:* The remaining land has been reserved for commercial use (3.92 sq km), mixed use (13.02 sq km) and public institutions.

*Green Buffer Zone:* A 50-metre-wide green belt will be developed along the project boundary, while a 150-metre-wide green belt will be created around Dongri Dam. Large-scale plantation will also be undertaken through the ‘Ek Ped Maa Ke Naam’ campaign.

*Zero Liquid Discharge:* The city’s drinking water requirement of 217.22 MLD will be met from Rajghat Dam, while treated water will be used for other purposes. BIDA will establish a 163.26 MLD Sewage Treatment Plant and a 150.88 MLD Common Effluent Treatment Plant in phases. Used water will be treated and reused, and no wastewater of any kind will be discharged into the Betwa, Pahuj or Angauri rivers.

*Successful Land Acquisition:* BIDA has so far acquired a total of 25,706 acres of land. Compensation is being provided to landowners at transparent rates in accordance with the provisions of the Act, 2013.

*Development of Rural Settlements:* Local rural habitation areas will be integrated with the BIDA city and provided with facilities such as modern parks, health centres, educational institutions and skill development centres.

BIDA CEO Sanjay Kumar Khatri said, “The environmental clearance received from the Environment Ministry marks the beginning of a new chapter in the history of Bundelkhand’s development. In line with the vision of Chief Minister Yogi Adityanath, BIDA will be developed as one of the country’s most modern, sustainable and environment-friendly industrial smart cities.”

He said, “While ensuring full compliance with all conditions laid down in the environmental clearance, the project will establish Bundelkhand on the global manufacturing map and bring significant improvement in the living standards of local citizens. The project will also play an important role in realising the vision of Atmanirbhar Bharat and Viksit Bharat.”

Published - June 02, 2026 10:58 am IST