惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

月光博客
月光博客
罗磊的独立博客
The GitHub Blog
The GitHub Blog
V
V2EX
Last Week in AI
Last Week in AI
博客园 - 聂微东
MyScale Blog
MyScale Blog
美团技术团队
L
LangChain Blog
博客园 - Franky
腾讯CDC
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
博客园_首页
S
SegmentFault 最新的问题
爱范儿
爱范儿
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
Stack Overflow Blog
Stack Overflow Blog
量子位
小众软件
小众软件
宝玉的分享
宝玉的分享
J
Java Code Geeks
Google DeepMind News
Google DeepMind News
D
Docker
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Flyover will be opened for traffic by December-end: MLA
2026-05-09 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
Mahesh Tenginakai, MLA, reviewing the progress of works on the elevated road and the laying of concrete roads beneath the flyover, in Hubballi on Friday (May 8).

Mahesh Tenginakai, MLA, reviewing the progress of works on the elevated road and the laying of concrete roads beneath the flyover, in Hubballi on Friday (May 8). | Photo Credit: KIRAN BAKALE

Mahesh Tenginakai, Hubballi Dharwad Central MLA, who reviewed the progress of the elevated road project around Kittur Chennamma Circle in Hubballi on Friday (May 8), said that the elevated road is likely to be opened for traffic by December-end.

Speaking to presspersons after walking on the stretch between Old Court Circle to Hosur Circle in Hubballi on May 8, Mr. Tenginakai said that already, 70% of the flyover work had been completed and the remaining will be completed in a couple of months, and by December end, the concrete road beneath the flyover, illumination, and other works would be completed.

The MLA also performed bhoomi puja for the concrete road opposite the IT Park in Hubballi during his inspection and said that the road work would be completed within four months.

Mr. Tenginakai told presspersons that a delegation led by Union Minister Pralhad Joshi met Union Minister for Road Transport and Highways Nitin Gadkari and sought additional funds for laying concrete roads beneath the elevated road. Responding to their plea, Mr. Gadkari had sanctioned ₹13 cr of additional grants.

He said that officials had told him the concrete road work between IT Park and Old Bus Station would be completed within 15 days, in addition to the road between Old Bus Station and Bhavani Arcade. The works for laying the concrete road near Old Court Circle had also simultaneously begun, he said.

“Out of the 294 girders to be installed for the elevated road, 262 have already been installed and another 32 girders are yet to be installed. This apart, 25 more girders are being readied. As box girders have to be readied at Kittur Chennamma Circle, traffic at the junction will be affected. Our efforts are under way to exert more pressure on the contractor to expedite the work further and complete the work at the earliest,” he said.

Mr. Tenginakai also said that the Public Works Department officials had promised him that the work to lay concrete roads at important junctions would be completed within a month and a half.

The MLA was accompanied by Deputy Mayor Santosh Chavan, Hubballi-Dharwad Municipal Corporation councillor Meenakshi Vantamuri, Deputy Commissioner of Police C.R. Raveen, National Highways Authority of India executive engineer Satish Naganur, Municipal Commissioner Rudresh Ghali, and others were present.

Published - May 09, 2026 09:21 pm IST