惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Apple Machine Learning Research
Apple Machine Learning Research
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
G
Google Developers Blog
博客园 - 司徒正美
J
Java Code Geeks
aimingoo的专栏
aimingoo的专栏
A
About on SuperTechFans
博客园 - 三生石上(FineUI控件)
WordPress大学
WordPress大学
T
The Blog of Author Tim Ferriss
D
Docker
大猫的无限游戏
大猫的无限游戏
D
DataBreaches.Net
腾讯CDC
V
Visual Studio Blog
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
C
Check Point Blog
M
MIT News - Artificial intelligence
Jina AI
Jina AI
I
InfoQ
雷峰网
雷峰网
The Cloudflare Blog
美团技术团队
Engineering at Meta
Engineering at Meta

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Secunderabad Cantonment’s non-functional sewer network to...
Siddharth Kumar Singh · 2026-06-24 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
A sewer network laid in Secunderabad Cantonment more than 15 years ago under a Japan-funded infrastructure project is set to become fully operational. The image is used for representative purposes only.

A sewer network laid in Secunderabad Cantonment more than 15 years ago under a Japan-funded infrastructure project is set to become fully operational. The image is used for representative purposes only. | Photo Credit: Representational Photo

A sewer network laid in Secunderabad Cantonment more than 15 years ago under a Japan-funded infrastructure project is set to receive financial push to make it fully operational, as the Secunderabad Cantonment Board (SCB) approved a ₹246.92-crore project to bridge connectivity gaps that left large sections of the system underutilised.

The project, titled Comprehensive Up-gradation of Underground Sewerage System (CUUSS), was approved during a recent board meeting. It will be executed by the Hyderabad Metropolitan Water Supply and Sewerage Board (HMWSSB) under the Equal Value of Infrastructure (EVI) mechanism linked to Defence land utilised for the construction of elevated corridor projects passing through the cantonment.

According to the Detailed Project Report (DPR) submitted by HMWSSB, the project involves laying and replacing 119.393 km of sewer pipelines of varying diameters at an estimated cost of ₹246.92 crore. Board records noted that HMWSSB had laid trunk sewer lines of more than 300 mm diameter within Secunderabad Cantonment under the Japan International Cooperation Agency (JICA) project in 2010. However, these trunk lines remained largely underutilised and non-functional because of gaps in connectivity between different stretches of the network.

The proposed project seeks to bridge these gaps by laying connecting pipelines and making the trunk network fully operational. Officials said the upgraded system would also facilitate diversion of sewage into the trunk lines, preventing the discharge of untreated sewage into open nalas.

The Board observed that existing sewer infrastructure in localities such as Anna Nagar and Rasoolpura is in a deteriorated condition, with inadequate gradients and insufficient carrying capacity. The shortcomings have led to recurring sewage overflows, causing inconvenience to residents and raising public health concerns.

The sewerage upgrade forms part of a larger infrastructure package proposed under the EVI scheme, through which civic infrastructure is being created in lieu of compensation for Defence lands affected by two elevated corridor projects — which includes the Paradise Junction-Shamirpet corridor on Rajiv Rahadari (SH-01) and the Paradise Junction-Dairy Farm Road corridor on NH-44.

The State government had proposed multiple infrastructure works under the EVI arrangement, including strategic nala development projects. However, with available EVI funds estimated at ₹303.62 crore, the Board decided to prioritise the sewerage project and execute it in a single phase.

The Board resolved that development works relating to Picket Nala and Hasmathpet Nala would be taken up later using the balance EVI funds and by exploring other sources such as MPLADS, MLA Local Area Development Funds, grants-in-aid and Finance Commission grants.

Published - June 24, 2026 03:40 pm IST