惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

宝玉的分享
宝玉的分享
B
Blog RSS Feed
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
MyScale Blog
MyScale Blog
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
S
SegmentFault 最新的问题
Y
Y Combinator Blog
月光博客
月光博客
IT之家
IT之家
T
Tailwind CSS Blog
Last Week in AI
Last Week in AI
L
LangChain Blog
博客园_首页
MongoDB | Blog
MongoDB | Blog
P
Proofpoint News Feed
博客园 - Franky
WordPress大学
WordPress大学
云风的 BLOG
云风的 BLOG
M
MIT News - Artificial intelligence
V
Visual Studio Blog
小众软件
小众软件
博客园 - 叶小钗
博客园 - 三生石上(FineUI控件)
N
Netflix TechBlog - Medium

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Bengaluru’s Peenya flyover declared safe after successful...
Darshan Devaiah B.P. · 2026-06-16 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
A view of the Peenya Elevated Flyover on National Highway-4, officially known as the Dr. Sri Shivakumara Swamiji Flyover.

A view of the Peenya Elevated Flyover on National Highway-4, officially known as the Dr. Sri Shivakumara Swamiji Flyover. | Photo Credit: File photo

The National Highways Authority of India (NHAI) has confirmed that the Peenya Elevated Flyover on National Highway-4, officially known as the Dr. Sri Shivakumara Swamiji Flyover, is structurally safe and fit for vehicular movement following the successful completion of a comprehensive load-bearing test conducted after recent cable repair works.

The flyover, one of Bengaluru’s busiest stretches, has undergone repeated repair and maintenance works since 2021, particularly involving the replacement and strengthening of cables. During each phase of repair, the elevated flyover was closed to traffic, resulting in severe congestion and bumper-to-bumper traffic on the roads below the flyover, especially along the Peenya, Jalahalli and Dasarahalli stretches.

To assess the effectiveness of the latest repair works and verify the structure’s safety, NHAI carried out an extensive load test between May 5 and May 8. The testing was conducted under the supervision of a technical committee and in accordance with the guidelines prescribed by the Indian Roads Congress (IRC).

Results found to be positive

According to officials, the objective of the test was to evaluate the flyover’s load-carrying capacity, structural integrity, stability and overall performance under simulated traffic loading conditions. The results were found to be positive, confirming that the repaired structure meets all required safety standards and is suitable for smooth traffic movement.

“After major repair and strengthening works, it is essential to verify that the structure is safe, stable and capable of carrying the intended traffic loads. Following the successful completion of cable repair works on the linear elevated flyover on NH-4, NHAI conducted a comprehensive load test to assess the structural performance of the flyover,” an official told The Hindu.

As part of the testing programme, heavily loaded trucks were strategically stationed at critical locations on the flyover to simulate maximum traffic loading conditions and generate the highest expected structural stresses. Engineers used advanced monitoring instruments, including deflection sensors, strain gauges, load cells and data acquisition systems, to continuously record the structure’s response during the test, according to officials.

The NHAI official said, “These highly sensitive instruments measured key structural parameters such as stress, strain, deflection, vibration and overall structural movement. During the static load test, the loaded vehicles remained stationary at designated positions while engineers closely monitored the flyover’s behaviour under load.”

Analysed data

The collected data was subsequently analysed and compared with permissible limits specified under relevant IRC standards. Officials stated that all observed readings remained within acceptable limits, confirming that the repaired sections satisfy the required safety and performance criteria.

The load-testing programme covered two repaired spans of the flyover. NHAI has indicated that similar tests will be conducted on the remaining repaired spans, including sections measuring 34.5 metres and 37.5 metres in length, to further verify their structural adequacy and load-carrying capacity before completion of the overall strengthening programme.

Published - June 16, 2026 07:59 pm IST