惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Blog — PlanetScale
Blog — PlanetScale
Vercel News
Vercel News
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
量子位
Y
Y Combinator Blog
IT之家
IT之家
博客园 - 聂微东
L
LangChain Blog
爱范儿
爱范儿
H
Help Net Security
GbyAI
GbyAI
F
Fortinet All Blogs
B
Blog
Microsoft Security Blog
Microsoft Security Blog
罗磊的独立博客
C
Check Point Blog
博客园 - 三生石上(FineUI控件)
小众软件
小众软件
D
DataBreaches.Net
Last Week in AI
Last Week in AI
WordPress大学
WordPress大学
B
Blog RSS Feed
酷 壳 – CoolShell
酷 壳 – CoolShell
宝玉的分享
宝玉的分享

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Sathuvachari - VIT Road in Vellore to be opened for publi...
2026-05-16 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
As per estimates, once completed, the new stretch can be used by at least 17,250 vehicles every day. 

As per estimates, once completed, the new stretch can be used by at least 17,250 vehicles every day.  | Photo Credit: Special Arrangement

The ₹90 crore Sathuvachari - VIT High Road, off Chennai - Bengaluru Highway (NH 48) in Vellore, will be opened for public use next month as the State Highways has speeded up the road laying work of the multi-crore project.

Highways officials said that the new stretch, which is a four-lane route, between Sathuvachari and Kangeyanallur village near VIT campus was aimed at decongesting Katpadi and surrounding areas from the existing traffic congestion “Major portion of the road work, including construction of bridge across Palar River has been completed. Electrical works to install streetlights on the new bridge is underway. The entire stretch will be ready soon,” R. Poovarasan, Assistant Engineer (AE), Department of Highways, told The Hindu.

Of the total 3.2 km, the State Highways has to complete 950 metres of road work that involves levelling of the carriageway with blue metal and bitumen. Currently, the final phase of levelling near VIT is being done. “The new stretch will cut travel time by at least 30 minutes to reach Bengaluru Highway from Katpadi. At present, motorists have to halt at five traffic intersections in the area to reach the highway,” said R. Santhosh, a motorist.

The Sathuvachari - VIT Road is 15 metres wide. As per estimates, once completed, the new stretch can be used by at least 17,250 vehicles every day. 

The roadwork also involved construction of two minor bridges and 20 culverts on the route. The new four-lane bridge, which is part of the new road, is 475 metres long and 15 metres wide. the bridge has been built at a height of 20 ft from the dry riverbed.

For residents and motorists, the new stretch will provide the shortest route to travel between Katpadi and Vellore. Vehicles can take this route to reach Chennai - Bengaluru Highway, bypassing congested Katpadi flyovers.

Published - May 16, 2026 05:30 am IST