惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

博客园 - 司徒正美
T
The Blog of Author Tim Ferriss
F
Fortinet All Blogs
Martin Fowler
Martin Fowler
罗磊的独立博客
The GitHub Blog
The GitHub Blog
L
LangChain Blog
A
About on SuperTechFans
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
D
DataBreaches.Net
宝玉的分享
宝玉的分享
U
Unit 42
阮一峰的网络日志
阮一峰的网络日志
Last Week in AI
Last Week in AI
N
Netflix TechBlog - Medium
The Cloudflare Blog
Microsoft Azure Blog
Microsoft Azure Blog
H
Help Net Security
美团技术团队
大猫的无限游戏
大猫的无限游戏
雷峰网
雷峰网
爱范儿
爱范儿
酷 壳 – CoolShell
酷 壳 – CoolShell
MongoDB | Blog
MongoDB | Blog

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Two-pronged strategy being implemented to improve power d...
The Hindu Bureau · 2026-06-19 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
Projects have also been planned to augment power sources in Gummidipoondi, Irungattukottai, Oragadum, Tiruvallur, Tiruttani, and Tiruvalangadu.

Projects have also been planned to augment power sources in Gummidipoondi, Irungattukottai, Oragadum, Tiruvallur, Tiruttani, and Tiruvalangadu. | Photo Credit: File photo

The Tamil Nadu Power Distribution Corporation Limited (TNPDCL), having come under fire for power disruptions during the past week after the city touched its peak power demand of 5,014 megawatt (MW) on June 8, has planned to tackle the issue by improving the distribution network in a big way.

A senior TNPDCL official said the power disruptions issue was not about power supply, rather deficiencies in distribution network in some localities. Chairman and Managing Director J. Radhakrishnan has planned to improve the distribution network in the city in two ways — expediting ongoing projects and taking up fresh ones to replace legacy assets and meet future demand growth.

Officials will continuously monitor the various distribution network projects, including the 400-kilovolt (KV) source connectivity to Taramani and Guindy and creating additional power sources in Manali and Pulianthope, which are places identified as thickly populated areas. Officials have also been directed to fast track ongoing substation works being executed in the city.

With several substation projects in the city currently at the 75%–95% completion stage, the works will be completed before summer next year. As part of substation work, dedicated project monitoring teams have been appointed to resolve issues regarding land acquisition and approvals, monthly review meeting between transmission, and distribution officials and ample procurement of electrical equipment.

Twenty substations have been identified as being in need of additional source arrangements including at Usman Road in T. Nagar, West Mambalam, Koyambedu, East Mogappair, Karambakkam, Red Hills, Iyyappanthangal, Gandhi Nagar in Adyar, Chitlapakkam, Injambakkam, and Kottivakkam.

Officials have also mapped places for adding power capacity in Sholinganallur on Rajiv Gandhi Salai, Chitlapakkam, Hasthinapuram, Madipakkam, Akkarai, Kodungaiyur, Vyasarpadi, Ambattur, Tiruverkaddu, Ennore, Madhavaram, and Thiruporur.

A ₹59.52-crore project to lay underground power cables for an estimated distance of 288 kilometres will be sanctioned and completed in a time-bound manner. Similar projects have also been planned to augment power sources in Gummidipoondi, Irungattukottai, Oragadum, Tiruvallur, Tiruttani, and Tiruvalangadu.

S. Ramesh, a resident of multi-storey apartment Purvankara in Medavakkam, urged the electricity department officials to take up the construction of a substation near the apartments, for which a vacant land had already been allotted.

Published - June 18, 2026 09:40 pm IST