惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

S
SegmentFault 最新的问题
博客园 - 三生石上(FineUI控件)
爱范儿
爱范儿
博客园 - 聂微东
V
Visual Studio Blog
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
M
MIT News - Artificial intelligence
The GitHub Blog
The GitHub Blog
Recent Announcements
Recent Announcements
有赞技术团队
有赞技术团队
L
LangChain Blog
I
InfoQ
T
Tailwind CSS Blog
博客园 - 【当耐特】
V
V2EX
博客园_首页
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
GbyAI
GbyAI
Vercel News
Vercel News
雷峰网
雷峰网
量子位
A
About on SuperTechFans
Martin Fowler
Martin Fowler
H
Help Net Security

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Corporations, BWSSB ramp up preparations ahead of monsoon
2026-05-12 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
Officials have been instructed to identify damaged roads, incomplete civic works, and dangerous buildings and report them immediately for further action. 

Officials have been instructed to identify damaged roads, incomplete civic works, and dangerous buildings and report them immediately for further action.  | Photo Credit: File photo

With the monsoon approaching, the newly formed Bengaluru city corporations have intensified preparedness measures, focusing on stormwater drain maintenance, road repairs, waste clearance, and identification of dangerous structures to prevent flooding and rain-related incidents across the city.

Pommala Sunil Kumar, commissioner of the North City Corporation, held a review meeting on Tuesday and directed officials to complete the desilting works of all stormwater drains and canals before the onset of the rains.

The commissioner told the officials to clear the accumulation of silt and garbage in drains as a priority, as it obstructs the free flow of rainwater. He also directed officials to clear roadside garbage heaps and prevent waste dumping into major drains.

He asked the officials to direct commercial establishments to ensure proper disposal of waste generated by their businesses. The commissioner further asked engineers, health officers, and sanitation staff to work in coordination with each other and take personal responsibility in resolving civic issues within their jurisdiction.

Mr. Kumar also emphasised the need for maintenance of arterial and sub-arterial roads to prevent water stagnation during heavy rainfall. Officials were instructed to identify damaged roads, incomplete civic works, and dangerous buildings and report them immediately for further action. Notices will also be served to owners of unsafe structures to prevent accidents during the monsoon.

Meanwhile, the Bengaluru East City Corporation held a separate review meeting chaired by the commissioner, D.S. Ramesh, to assess the maintenance of major stormwater drains and infrastructure works undertaken under the Chief Minister’s infrastructure development programme grants.

The commissioner directed officials to prepare ward-wise action plans for stormwater drain maintenance and mandated desilting of drains once every three months. Around 35 km of concrete drains in the Mahadevapura zone and 45 km in the K.R. Puram zone will undergo maintenance works. Executive engineers were instructed to monitor the works continuously, fix daily cleaning targets, and submit before-and-after drone footage as proof of maintenance.

He also directed officials to inspect flood-prone areas and take precautionary measures to prevent flooding. Mr. Ramesh also instructed officials to immediately identify and remove dangerous buildings, compound walls, and retaining walls, warning that engineers concerned would be held directly responsible for any accidents caused by unsafe structures.

15-day deadline

Meanwhile, the Bengaluru Water Supply and Sewerage Board (BWSSB) on Tuesday convened a monsoon preparedness meeting to discuss the completion of priority works to ensure that there is no inconvenience to the public during the monsoon.

BWSSB chairman, Ram Prasath Manohar, directed officials to undertake precautionary measures and complete all sewer desilting works within the next 15 days.

He told the officials that preventing flooding in low-lying areas of the city and ensuring that manholes do not overflow should be the top priority. “The areas that are prone to rain-related damage must be identified immediately, and the cleaning of manholes along with desilting work must be mandatorily completed within the next 15 days,” he instructed.

Dr. Manohar emphasised that strict measures must be taken to ensure that rainwater does not enter the sewerage system. “Zonal Chief Engineers should not confine themselves to office work. They must personally visit field locations and conduct physical inspections of the ongoing works. It is also mandatory to submit comprehensive reports to the central office regarding the precautionary measures undertaken,” he said.

He also stated that the system must remain fully prepared to respond immediately in case of manhole blockages or any other issues during the monsoon. “For this purpose, a dedicated emergency response team must be kept ready under each corporation's jurisdiction. Public grievances must be addressed without delay and resolved promptly,” he said.

Published - May 12, 2026 08:39 pm IST