惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

博客园 - 司徒正美
月光博客
月光博客
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
美团技术团队
WordPress大学
WordPress大学
罗磊的独立博客
Last Week in AI
Last Week in AI
人人都是产品经理
人人都是产品经理
爱范儿
爱范儿
MongoDB | Blog
MongoDB | Blog
J
Java Code Geeks
H
Hackread – Cybersecurity News, Data Breaches, AI and More
H
Help Net Security
S
SegmentFault 最新的问题
C
Check Point Blog
酷 壳 – CoolShell
酷 壳 – CoolShell
腾讯CDC
Engineering at Meta
Engineering at Meta
The GitHub Blog
The GitHub Blog
F
Fortinet All Blogs
D
DataBreaches.Net
雷峰网
雷峰网
GbyAI
GbyAI
宝玉的分享
宝玉的分享

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Puducherry to handle patta transfer, sub-division mutatio...
S. Prasad · 2026-05-31 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
A view of the District Collectorate complex in Puducherry

A view of the District Collectorate complex in Puducherry | Photo Credit: S.S. Kumar

The Directorate of Survey and Land Records has issued a Standard Operating Procedure for patta transfer and subdivision mutation in the Union Territory, bringing all subdivision processing at the Taluk level from June 1, 2026.

The SOP ends the practice of forwarding subdivision files to the Directorate for re-checking and sets a 60-day time limit for disposal of petitions.

“This measure has been institutionalised to ensure absolute transparency, systematic record-keeping, and the complete elimination of administrative delays for the general public”, Director of Survey and Land Records C. Sendhil Kumar said.

He added, “The legacy practice of forwarding subdivision files from the Tahsildar and Deputy Tahsildar Offices to this Directorate for re-verification will be completely stopped. Henceforth, all land subdivision mutations will be comprehensively processed, physically measured on-site, technically scrutinised, verified against the Nilamagal database, and finalised directly at the respective Tahsildar or Deputy Tahsildar office level alone. Further, the Tahsildar Office shall provide a written intimation to the applicants confirming the successful completion of the patta mutation.”

Under the new SOP, applicants must submit registered link documents with their petition, after which the case will be verified by the Village Administrative Officer or Revenue Inspector before technical survey work begins. 

The specified officer will then approve the file for measurement, boundary demarcation, and preparation of the Field Measurement Book and subdivision land record statement.

The order also mandates separate village-wise registers for patta transfer and claims and objections, with immediate entry of any objection or court notice received during the process. The SOP also fixes a maximum 60-day disposal period for subdivision mutation petitions.

Survey staff must maintain petition registers, while monthly reconciliation and periodic inspections have been made compulsory to track pending and disposed cases.

Technical scrutiny will be done through Nilamagal software before the final patta is issued. The Taluk office will then forward the full set of records, including the application, summons, Field Measurement Book and Area Alteration Memorandum, to the Director of Survey for master record incorporation.

Official sources said the new order is significant because it shifts the core responsibility for subdivision mutation from the Directorate to the Taluk offices, while also tightening deadlines, record-keeping, and audit controls. 

The move is intended to improve transparency, reduce delays, and streamline land record changes across Puducherry. 

Published - May 31, 2026 12:22 pm IST