惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

雷峰网
雷峰网
GbyAI
GbyAI
Stack Overflow Blog
Stack Overflow Blog
Apple Machine Learning Research
Apple Machine Learning Research
The Cloudflare Blog
WordPress大学
WordPress大学
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
F
Fortinet All Blogs
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
Microsoft Azure Blog
Microsoft Azure Blog
酷 壳 – CoolShell
酷 壳 – CoolShell
博客园 - 聂微东
L
LangChain Blog
云风的 BLOG
云风的 BLOG
Jina AI
Jina AI
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
I
InfoQ
大猫的无限游戏
大猫的无限游戏
MyScale Blog
MyScale Blog
人人都是产品经理
人人都是产品经理
小众软件
小众软件
量子位
The GitHub Blog
The GitHub Blog
博客园 - 【当耐特】

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Fadnavis asks officials to fast-track water conservation ...
2026-05-09 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
Maharashtra Chief Minister Devendra Fadnavis.

Maharashtra Chief Minister Devendra Fadnavis. | Photo Credit: File

Mumbai

In the wake of El Niño concerns, the Maharashtra government has directed officials to complete water conservation works on a war footing under the Jalyukt Shivar Abhiyan 2.0 and prioritise measures to improve groundwater levels.

Chief Minister Devendra Fadnavis reviewed the functioning of the Soil and Water Conservation Department and directed officials to submit plans under the Jalyukt Shivar Abhiyan 2.0 before May 15.

“The administration should consider the urgency of repair works in the villages and [they are] to be executed immediately. The work should be accelerated by giving revised plans to the districts, whereas the work in the villages under Jalyukt Shivar should be prioritised,” Mr. Fadnavis said.

He also referred to meetings with Union Ministers to secure increased funds under the Pradhan Mantri Krishi Sinchai Yojana.

According to the Soil and Water Conservation Department, 1,44,697 works have been approved under the Jalyukt Shivar Abhiyan 2.0, of which 1,10,120 have been completed. The remaining works are in progress and are planned to be completed at the earliest.

During the meeting, Soil and Water Conservation Minister Sanjay Rathod, Secretary of the Soil and Water Conservation Department Jitendra Papalkar, Principal Secretary to the Chief Minister Dr. Shrikar Pardeshi, Water Adviser to the Chief Minister Shriram Vedire, Officer on Special Duty Priya Khan, Soil and Water Conservation Commissioner Anjali Ramesh, and Maharashtra Water Conservation Corporation Managing Director Vijay Devraj were present.

Mr. Rathod said, “The work will now accelerate with our blueprint. The guidelines have also been prepared to ensure that the works are completed as per the original plan. However, permissions are required to remove encroachments at the Malgujari lakes.”

The work to conduct on-site verification of soil and water conservation projects is under way. So far, out of 15,15,000 works, 12,27,000 structures have been verified on-site. As many as 477.73 lakh cubic metres of silt have been removed from 1,435 reservoirs. As a result, water storage of 30,835 has been restored and 73,417 acres of land has become fertile.

Mr. Rathod said district-wise desilting work had been planned to be completed by June 15, according to the Soil and Water Conservation Department.

Under the Pradhan Mantri Krishi Sinchai Yojana, 22,000 works have been completed and geo-tagged. Further, 57 Amrit Sarovars are being constructed under the watershed development component, and 31 of them are planned to be completed by June 15.

He also said that under the department’s five-year master plan, 1,21,583 works have been proposed across 27,942 micro-watersheds in the State.

According to the Chief Minister’s Office, the Centre’s Viksit Bharat Guarantee for Rozgar and Ajeevika Mission (VB-GRAM) scheme should be utilised for carrying out these works. It also said bamboo plantation should be considered along drains during nala deepening works to prevent silt accumulation.

The government has also directed officials to complete repair works of the Malgujari lakes in Vidarbha by June.

Published - May 09, 2026 03:14 pm IST