惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

D
Docker
博客园 - 三生石上(FineUI控件)
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
博客园_首页
Microsoft Azure Blog
Microsoft Azure Blog
GbyAI
GbyAI
腾讯CDC
酷 壳 – CoolShell
酷 壳 – CoolShell
M
MIT News - Artificial intelligence
Stack Overflow Blog
Stack Overflow Blog
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
Jina AI
Jina AI
爱范儿
爱范儿
博客园 - 【当耐特】
雷峰网
雷峰网
S
SegmentFault 最新的问题
美团技术团队
Blog — PlanetScale
Blog — PlanetScale
The GitHub Blog
The GitHub Blog
有赞技术团队
有赞技术团队
G
Google Developers Blog
大猫的无限游戏
大猫的无限游戏
Google DeepMind News
Google DeepMind News
J
Java Code Geeks

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
From collapse to comeback: Tungabhadra dam in Karnataka g...
Kumar Buradikatti · 2026-05-16 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
Nearly two years after Gate No. 19 was washed away, the historic Tungabhadra Dam near Hosapete stands renewed with all 33 crest gates replaced. It is set to be inaugurated by month-end.

Nearly two years after Gate No. 19 was washed away, the historic Tungabhadra Dam near Hosapete stands renewed with all 33 crest gates replaced. It is set to be inaugurated by month-end. | Photo Credit: File photo

When Crest Gate No. 19 of the Tungabhadra Dam near Hosapete was washed away late on August 10, 2024, it triggered panic among lakhs of farmers dependent on the reservoir for irrigation.

The massive reservoir, considered the lifeline of north Karnataka and parts of Andhra Pradesh and Telangana, was then brimful with 105.788 tmcft of water at the Full Reservoir Level (FRL) of 1,633 feet. Within minutes of the chain link snapping, nearly 35,000 cusecs of water began gushing uncontrollably through the damaged bay. Engineers scrambled to open the remaining gates to reduce pressure on the structure even as fears mounted downstream.

What began as a terrifying engineering emergency soon evolved into one of the biggest dam rehabilitation exercises undertaken in recent years. The crisis triggered intense technical efforts, political attention, farmers’ anxiety and inter-State coordination. Nearly two years later, it has culminated in the replacement of all the 33 crest gates. The old ones operated through an overhead bridge mechanism involving chains, gearboxes, motors and counterweights. For nearly seven decades, the gates functioned without major overhauling.

When the gates gave way in 2024, experts from Hyderabad, Chennai and Bengaluru, along with engineers from JSW Steel and local fabrication companies, began working. Hydro-mechanical expert N. Kannaiah Naidu emerged as a key figure in the operation, preparing designs and technical drawings for the temporary stop-log arrangement. The operation itself was extremely risky as the engineers had to work amid powerful currents and fluctuating discharge conditions.

Against all odds, the engineers succeeded. On August 17, 2024, just seven days after the disaster, the team successfully installed the temporary stop-log gate made up of five massive steel elements. It prevented further catastrophic water loss.

Experts, who inspected the dam after the incident, advised comprehensive replacement of all the 33 crest gates, considering their age and long years of operation without major overhaul. Following technical committee recommendations, the Tungabhadra Board decided to replace all 33 spillway gates. The Tungabhadra Board later entrusted the replacement work to Ahmedabad-based Hardware Tools & Machinery Projects Pvt. Ltd.

The large-scale replacement work gathered momentum in late 2025, involving dismantling old gates and erecting new ones within a narrow working window.

The dismantling and erection of all 33 gates was completed in 123 days, between December 24, 2025, and April 25, 2026. Trial runs had also been successfully conducted for the newly installed gates, while the remaining finishing works are in the final stages of completion.

The project also involved the replacement of 68 lifting chains and 100 bevel gear units. Though a detailed examination had found the existing chains to be structurally strong, the then Deputy Chief Minister D.K. Shivakumar (now Chief Minister-designate), during his visit to the dam on May 3, 2026, said that the government had decided to replace all the chains as a precautionary measure. Third-party quality inspection agencies from Hyderabad were engaged for testing and monitoring the works. The total cost of replacing all 33 spillway gates, along with chain links and quality inspections, stood at around ₹51 crore.

The successful replacement of all 33 crest gates has now become a story of recovery after crisis, with relentless effort by engineers and workers, who raced against time to save one of South India’s most important irrigation projects.

As the renovated gates prepare to be formally dedicated, the Tungabhadra Dam stands not just restored, but renewed. Engineers associated with the project believe the comprehensive replacement of all the 33 crest gates has enhanced the structural safety of the dam and extended its operational life by another 50 years.

Soon, the government is planning to hold a huge public meeting inviting the farmers from the command area, especially from Koppal, Raichur and Ballari, to dedicate the renewed dam to the nation.

Published - May 16, 2026 06:58 pm IST