惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

博客园_首页
爱范儿
爱范儿
罗磊的独立博客
V
V2EX
量子位
Last Week in AI
Last Week in AI
Hugging Face - Blog
Hugging Face - Blog
博客园 - 司徒正美
Jina AI
Jina AI
博客园 - 叶小钗
小众软件
小众软件
博客园 - 【当耐特】
Y
Y Combinator Blog
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
T
Tailwind CSS Blog
博客园 - 聂微东
Microsoft Security Blog
Microsoft Security Blog
美团技术团队
P
Proofpoint News Feed
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
有赞技术团队
有赞技术团队
MongoDB | Blog
MongoDB | Blog
Recent Announcements
Recent Announcements
酷 壳 – CoolShell
酷 壳 – CoolShell

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Over 1,700 tonnes of Bengaluru’s daily waste has nowhere ...
Rishita Khanna · 2026-06-19 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

While Bengaluru’s daily waste generation is crossing 5,880 tonnes, the city is able to process only about 4,105 tonnes, leaving a shortfall of 1,775 tonnes every day.

To bridge the gap, GBA, the five corporations and BSWML have planned a sweeping overhaul of the waste-management system that includes new processing facilities, separate mechanisms for construction and demolition (C&D) waste, bulky waste and animal waste, and a restructuring of garbage collection and transportation.  

Of the 1,775 tonnes of waste that the city is unable to process every day, wet waste makes up the largest share at 677 tonnes, followed by dry waste at 545 tonnes. The proposal was recently discussed with Bengaluru Development Minister Krishna Byre Gowda.  

As part of the proposed overhaul, a new model – only for collection and transportation (C&T), comprising 33 contract packages has been envisaged, with an estimated annual expenditure of ₹619 crore, amounting to about ₹5,040 crore over seven years. The model would replace the existing system that relies on hundreds of supply agencies with larger, division-based contract packages. 

Gap between generation and processing: 1,775 tonnes per day (TPD) 

C&D waste: 6,000 TPD generated versus 2,050 TPD capacity   Legacy waste: 36.5 lakh MT still pending at single site  

Biomethanation plants — 16  

Operational: 6  

Under construction/defunct: 10 

Total planned mini transfer stations — 26

Not functional/not operational: 7  

Patchy collection

Officials told The Hindu that on the ground, about 5,020 auto-tippers and nearly 600 compactors have been operating, with each auto serving nearly 750 to 1,000 households. The system was brought in to scale up the coverage but it has become fragmented and difficult to streamline under a unified operational model, an official said, pointing that many vehicles are not going for collection, almost all are without GPS, and many are going to only a few areas and not covering all assigned routes. All this is leading to patchy collection.  

Processing level is another crucial point, and the current solid waste management infrastructure shows “stress points”, the official said. He added that Bengaluru has a combined waste processing capacity of a little over 4,100 tonnes per day, but utilisation is uneven.  

Defunt, under construction

“Of the 16 biomethanation plants meant for decentralised wet waste treatment, only six are currently operational, while six are defunct and the rest are under construction. Similarly, of the planned 26 mini transfer stations, seven are not functional, and out of 30 larger transfer stations which were set up to improve secondary movement of waste, only three are operational at present,” the official said.  

Apart from operational and collection challenges, the official said that a persistent problem is legacy waste. “The city carries a heavy legacy burden, with about 36.5 lakh metric tonnes of accumulated waste at Bellahalli alone, while remediation work is ongoing at multiple old dump sites across the city,” the official said.  

“Construction and demolition waste remains another major pressure point, with around 6,000 tonnes generated every day against a processing capacity of only about 2,050 tonnes,” the official said, adding that gap in C&D waste has also lead to discussions where proposals are outlined to expand treatment facilities significantly under PPP model. 

Dry waste

Even dry waste management is still far from a functioning recycling system, the official lamented, pointing that the city has 124 dry waste collection centres, but together they can handle only about 266 tonnes of waste a day, a fraction of what is generated. 

“As a result, most dry waste, especially low-value plastic that cannot be easily recycled, does not stay within any local processing chain. Instead, around 1,100 tonnes of such waste is pushed out daily to waste-to-energy plants and cement factories, where it is ultimately burnt or co-processed rather than recycled back into use,” the official added.