惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

WordPress大学
WordPress大学
Engineering at Meta
Engineering at Meta
D
DataBreaches.Net
月光博客
月光博客
Recent Announcements
Recent Announcements
Google DeepMind News
Google DeepMind News
U
Unit 42
腾讯CDC
爱范儿
爱范儿
J
Java Code Geeks
有赞技术团队
有赞技术团队
Blog — PlanetScale
Blog — PlanetScale
N
Netflix TechBlog - Medium
B
Blog
Stack Overflow Blog
Stack Overflow Blog
GbyAI
GbyAI
T
The Blog of Author Tim Ferriss
小众软件
小众软件
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
Y
Y Combinator Blog
大猫的无限游戏
大猫的无限游戏
Microsoft Azure Blog
Microsoft Azure Blog
T
Tailwind CSS Blog
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Kochi Corpn. seeks deferment of canal restoration
The Hindu Bureau · 2026-05-30 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
The incomplete Mullassery Canal restoration may continue to pose problems in the city this monsoon.

The incomplete Mullassery Canal restoration may continue to pose problems in the city this monsoon. | Photo Credit: H. VIBHU

The Kochi Corporation has directed the Minor Irrigation department to defer restoration of the remaining 175-metre stretch of the Mullassery Canal until after the monsoon.

Mayor V.K. Minimol has instructed that the work be postponed until around August, citing serious civic issues that could arise if the road is dug up and the canal blocked during the peak monsoon months. The department had been considering completing the ₹4.80-crore project using pre-cast technology within six to eight months of its commencement.

Ms. Minimol said the Corporation has earmarked ₹20 crore for pre-monsoon works, including ₹13 lakh each for the 76 divisions. In addition, ₹50,000 has been allocated to each division for urgent monsoon-related restoration works.

During a recent meeting, the Corporation had taken up the severe waterlogging threat faced by six divisions from Kunnumpuram to Palarivattom due to the ongoing national highway works at Edappally with the State government. The government has assured that the blocked drains will be restored by June 1, according to the Mayor.

She added that the ongoing metro rail works have caused severe problems in several divisions, with drains along many stretches clogged by slurry. The Corporation has tasked Kochi Metro Rail Limited with clearing the slurry and restoring the drains at multiple locations.

“The stretch in front of St. Martin Church remains one of the worst bottlenecks, reducing traffic on both sides to a crawl. With barriers in place, only a narrow stretch of road is available for vehicles, and that too is poorly surfaced and riddled with potholes. The situation is likely to worsen once the monsoon sets in,” she said.

The Corporation claimed that smaller canals and drains have been cleaned, while work to clear larger canals is under way. Eight of the 13 railway culverts have also been cleaned.

However, Opposition Left Democratic Front parliamentary party leader V.A. Sreejith alleged that monsoon preparatory works have derailed in several areas. “Cleaning of major canals and backwater mouths, crucial for the smooth drainage of rainwater from the city, has either not been completed or not even started. Though files related to monsoon preparatory works were cleared before the model code of conduct came into force ahead of the Assembly election, the governing committee failed to ensure proper oversight,” he said.

He further alleged that the Corporation had failed to effectively coordinate with various departments, a key requirement for preventing waterlogging in the city. The initial spell of rain, which caused waterlogging in several areas, was a grim reminder of what the city could face during monsoon, Mr. Sreejith said.

Published - May 30, 2026 01:21 am IST