惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Google DeepMind News
Google DeepMind News
C
Check Point Blog
J
Java Code Geeks
腾讯CDC
Martin Fowler
Martin Fowler
MongoDB | Blog
MongoDB | Blog
H
Hackread – Cybersecurity News, Data Breaches, AI and More
博客园 - 三生石上(FineUI控件)
Apple Machine Learning Research
Apple Machine Learning Research
大猫的无限游戏
大猫的无限游戏
Engineering at Meta
Engineering at Meta
罗磊的独立博客
Last Week in AI
Last Week in AI
B
Blog
IT之家
IT之家
S
SegmentFault 最新的问题
D
DataBreaches.Net
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
GbyAI
GbyAI
博客园 - 聂微东
U
Unit 42
有赞技术团队
有赞技术团队
Y
Y Combinator Blog
MyScale Blog
MyScale Blog

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
GBA likely to seek another extension till December for polls
2026-05-21 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
A view of the  Greater Bengaluru Authority building in Bengaluru.

A view of the Greater Bengaluru Authority building in Bengaluru.

Notwithstanding the two-month extension till August 31 given by the Supreme Court, the Greater Bengaluru Authority (GBA), with intervention from the State government, will seek yet another extension – this time till December, to conduct the long-pending GBA elections. This is despite the Supreme Court pulling up the Karnataka Government on Wednesday for ‘deploying tactics’ and terming the extension as its ‘last chance.’

Speaking with The Hindu, officials said the Special Intensive Revision (SIR) schedule was officially announced only on May 14, barely a week before the hearing, and argued that conducting both exercises simultaneously with the same field staff would be “impossible”. Meanwhile, a senior official added that they would also approach the Election Commission of India to understand how GBA polls and SIR activities are expected to run in parallel with the same human resources. 

A corporation official said that a recent meeting was held with the senior officials from the Urban Development Department, where it was discussed that even an extension till September would not make the conduct of polls feasible as SIR activities will go till October. 

“While seeking extension till September, we did not know about the SIR schedule. SIR for Karnataka was announced only on May 14. The activities will continue till October 7, and that too only if everything goes exactly as per schedule. How can we conduct GBA polls in the middle of this? The same officials are involved in house-to-house visits and the entire SIR process,” an official said. He added that even after SIR concludes, authorities would need at least another month to prepare for the polls and would therefore seek an extension till the end of December. “Conducting polls in December is also ambitious,” the official further said. 

GBA to also approach ECI

Another senior GBA official said the GBA would approach the government, the Karnataka State Election Commission and the Election Commission of India to understand how to approach the polls and SIR now that the election schedule would have to be aligned with the SC’s August 31 deadline. The official also expressed frustration that while the GBA had sought time till September, the court granted an extension only till August. 

SIR-related activities in Karnataka are scheduled to begin on June 20 with preparation, training and printing work, followed by house-to-house verification by BLOs from June 30 to July 29. Draft electoral rolls are to be published on August 5, after which the claims and objections phase, notice hearings and corrections process will continue till the final rolls are published on October 7. 

The National Census 2027 exercise -- extended in Karnataka till May 22, along with SIR and monsoon preparedness, were cited by the GBA as key reasons while seeking a “slight extension”. While the government has repeatedly cited a “manpower problem”, voter mapping for SIR has already crossed 86% across Karnataka, with Bengaluru Urban alone crossing 75%. Census work, too, is nearing its deadline.  

However,  GBA officials rejected suggestions that this reduces the burden and makes it feasible for elections. The officials argued that the most difficult phase is yet to begin, particularly the claims and objections stage after publication of draft rolls, which would place “enormous pressure” on BLOs and enumerators and increase the risk of errors if both exercises are forced to run simultaneously.  

Karnataka State Election Commissioner G.S. Sangreshi was not available for comment. 

Published - May 20, 2026 09:48 pm IST