惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

阮一峰的网络日志
阮一峰的网络日志
雷峰网
雷峰网
Last Week in AI
Last Week in AI
T
Tailwind CSS Blog
V
Visual Studio Blog
Jina AI
Jina AI
博客园 - 司徒正美
The Cloudflare Blog
Hugging Face - Blog
Hugging Face - Blog
博客园_首页
S
SegmentFault 最新的问题
博客园 - 三生石上(FineUI控件)
有赞技术团队
有赞技术团队
小众软件
小众软件
V
V2EX
Apple Machine Learning Research
Apple Machine Learning Research
美团技术团队
博客园 - 【当耐特】
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
IT之家
IT之家
WordPress大学
WordPress大学
爱范儿
爱范儿
月光博客
月光博客
大猫的无限游戏
大猫的无限游戏

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Work for PRR likely to begin soon as formalities gather pace
The Hindu Bureau · 2026-06-24 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
Special Land Acquisition Officers have been instructed to speed up compensation payments to landowners who have already consented to hand over possession of their land. 

Special Land Acquisition Officers have been instructed to speed up compensation payments to landowners who have already consented to hand over possession of their land.  | Photo Credit: File Photo

Soon after the Letter of Acceptance was issued to Bengaluru-based Shankaranarayana Constructions (SNC) for the first package of the long-pending Bengaluru Business Corridor (BBC), earlier known as the Peripheral Ring Road (PRR), L.K. Atheeq, BBC chairman, directed officials to expedite land acquisition compensation payments and complete the pending administrative formalities to enable the start of the construction work. 

Following a review meeting with officials from the land acquisition and engineering sections of BBC, as well as representatives of the project contractor on Wednesday, Mr. Atheeq instructed all Special Land Acquisition Officers to speed up compensation payments to landowners who have already consented to hand over possession of their land. 

“The contractor has submitted the bank guarantee required as performance security, hence the engineering section has been directed to sign the agreement and issue the work order within the next two days, paving the way for the formal commencement of the project,” he said. 

Moreover, the final notification has been issued for the acquisition of land required for the integration of the project with the NICE corridor at Madavara village. Officials have been instructed to complete the award process and begin disbursing compensation, the official said. 

The engineering section will seek permissions from the National Highways Authority, the Public Works Department, and the Railways for the construction of Road Over Bridges at locations where the alignment intersects their infrastructure. The contractor, SNC, has been asked to follow up on these clearances along with BCC officials, Mr. Atheeq said.  

“The preparatory work has largely been completed, and construction is expected to begin shortly on land parcels that are free from encumbrances and are already available with the authorities,” he said.  

Published - June 24, 2026 07:49 pm IST