惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

B
Blog RSS Feed
博客园 - 叶小钗
F
Fortinet All Blogs
GbyAI
GbyAI
Martin Fowler
Martin Fowler
博客园 - 聂微东
I
InfoQ
B
Blog
IT之家
IT之家
美团技术团队
L
LangChain Blog
小众软件
小众软件
C
Check Point Blog
MongoDB | Blog
MongoDB | Blog
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
V
V2EX
Last Week in AI
Last Week in AI
A
About on SuperTechFans
博客园 - Franky
P
Proofpoint News Feed
罗磊的独立博客
月光博客
月光博客
V
Visual Studio Blog
MyScale Blog
MyScale Blog

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Clear hurdles to highway, railway projects, Minister tell...
2026-05-18 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

Roads & Buildings, Investments and Infrastructure Minister B.C. Janardhan Reddy on Monday directed officials to resolve pending issues related to land acquisition and forest clearances to ensure completion of National Highway and railway projects in the State by December 2026.

Chairing the fourth Task Force Committee review meeting at the Secretariat in Amaravati, the Minister reviewed the progress made since the third committee meeting held in August last year and sought project-wise updates from senior officials of the National Highways and Railways.

Referring to directions issued by Chief Minister N. Chandrababu Naidu, Mr. Janardhan Reddy instructed officials to expedite pending National Highway works being executed under the supervision of the National Highways Authority of India and the Ministry of Road Transport and Highways. He urged various departments to coordinate effectively and make optimum use of the Centre’s support for infrastructure development.

Officials informed the Minister that, of the 21 land acquisition issues related to National Highway projects, nine had been fully resolved while 12 had been partially addressed since the previous review meeting. Of the total 602 km identified for land acquisition, acquisition for 397 km had been completed so far.

Reviewing railway projects separately, the Minister stressed the need for coordinated efforts to complete all ongoing railway works, including ROBs and RUBs, by December 2026. He directed officials to expedite land acquisition for sanctioned railway lines and conduct monthly district-level reviews with Joint Collectors to resolve pending issues.

The Minister said cost-sharing issues relating to the Kotipalli–Narsapuram, Nadikudi–Srikalahasti, Bhadrachalam–Kovvur and Kadapa–Bengaluru railway projects would be taken up with the Union Railway Ministry for an early decision. Senior officials from the R&B, Railways, Revenue and Forest departments attended the meeting.

Published - May 18, 2026 08:09 pm IST