惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

IT之家
IT之家
Microsoft Azure Blog
Microsoft Azure Blog
人人都是产品经理
人人都是产品经理
博客园 - 聂微东
博客园_首页
阮一峰的网络日志
阮一峰的网络日志
V
V2EX
小众软件
小众软件
F
Fortinet All Blogs
Microsoft Security Blog
Microsoft Security Blog
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
H
Hackread – Cybersecurity News, Data Breaches, AI and More
量子位
Google DeepMind News
Google DeepMind News
Jina AI
Jina AI
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
aimingoo的专栏
aimingoo的专栏
B
Blog RSS Feed
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
宝玉的分享
宝玉的分享
有赞技术团队
有赞技术团队
J
Java Code Geeks
WordPress大学
WordPress大学
The Cloudflare Blog

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Ganga Expressway to cut freight time, unlock ₹30,000 cror...
PTI · 2026-05-24 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

The newly-opened 594-km Ganga Expressway is expected to significantly reduce freight transit time across Uttar Pradesh, unlock annual logistics savings of up to ₹30,000 crore, and spur industrial and warehousing growth across more than a dozen districts, according to government estimates and industry players.

The six-lane expressway, expandable to eight lanes, connects Meerut to Prayagraj through 12 districts, and is being projected as a major logistics and industrial corridor linking western and eastern U.P..

Industry estimates suggest U.P. currently handles around 245-260 million tonnes of intra-state freight annually, largely comprising food grains, construction material, and retail goods, while outbound freight volumes are estimated at 135-150 million tonnes, driven by electronics, leather, and agricultural produce.

U.P. Industrial Development Minister Nand Gopal Gupta told PTI that the expressway would become "a new chapter" in the state's economy by accelerating industrial development, logistics, agriculture, tourism and employment generation.

Mr. Gupta said the project, inaugurated by Prime Minister Narendra Modi on April 29 in Hardoi, has reduced travel time between Meerut and Prayagraj from around 10-12 hours to nearly 5-8 hours.

"The expressway is not merely a road project but an integrated manufacturing and logistics corridor. Faster freight movement and reduced transportation costs can generate annual logistics savings of ₹25,000-30,000 crore," Mr. Gupta told PTI.

He said that the State has already received 987 investment proposals worth about ₹46,660 crore along the corridor, with 12 industrial nodes being developed over 6,507 acres.

Sectors, including manufacturing, textiles, food processing, pharmaceuticals, electronics, warehousing and e-commerce, are expected to benefit, while proposed pharma, textile and IT parks could create large-scale employment opportunities, he said.

Dipanjan Banerjee, Chief Commercial Officer at Blue Dart, said that the expressway would fundamentally reshape logistics operations in UP by reducing dependence on traditional routing hubs.

"The missing link has been a seamless northern corridor connecting the NCR belt directly to eastern districts. The Ganga Expressway effectively bridges that gap," he told PTI.

Mr. Banerjee said the state was emerging as a major logistics market due to rising consumption, industrial clusters, and rapid growth in Tier-2 and Tier-3 cities.

He added that sectors such as e-commerce, pharmaceuticals, agri-produce and FMCG would particularly benefit from faster and more predictable freight movement.

Jitendra Srivastava, CEO of Triton Logistics & Maritime, said the expressway would improve supply chain predictability and strengthen links to air cargo and freight corridors.

He said the northern region currently accounts for around 31.3% of India's air freight movement, and the expressway would help streamline cargo movement towards airports and ports.

"The corridor will improve movement of perishables, textiles, and electronics and enhance U.P.'s global trade competitiveness," he said.

Nikhil Agarwal, President of CJ Darcl Logistics Ltd, said the expressway was already generating interest among companies looking to establish warehousing and distribution centres in cities such as Prayagraj, Hardoi and Shahjahanpur.

He further said that improved connectivity and relatively lower land costs along the corridor were making outsourced logistics and warehousing models commercially viable.

"The next phase of logistics growth in India will not be driven by metros alone, but by emerging corridors such as this," Mr. Agarwal told PTI.

Officials said the expressway would also strengthen connectivity with other major corridors, including the Agra-Lucknow, Bundelkhand, Purvanchal, Delhi-Mumbai, and Ganga expressways, besides supporting future industrial and export-oriented growth in the State.

The expressway passes through Meerut, Hapur, Bulandshahr, Amroha, Sambhal, Budaun, Shahjahanpur, Hardoi, Unnao, Raebareli, Pratapgarh and Prayagraj.

According to Minister Gupta, the project is expected to contribute over ₹1 lakh crore to the state economy in the long run and support U.P.'s target of becoming a $1 trillion economy. The expressway is also set for further expansion in the future to connect with Uttarakhand.

During the inauguration of the project on April 29, Prime Minister Modi noted that the Ganga Expressway, whose foundation stone was laid in December 2021, has been completed in less than five years and is among the country's largest expressways.

The Prime Minister said that work has also begun on its expansion and that the expressway will soon extend beyond Meerut to Haridwar, besides being linked to other expressways through the proposed Farrukhabad Link Expressway.