惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

雷峰网
雷峰网
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
博客园 - 三生石上(FineUI控件)
博客园 - 聂微东
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
Hugging Face - Blog
Hugging Face - Blog
Apple Machine Learning Research
Apple Machine Learning Research
博客园 - Franky
MyScale Blog
MyScale Blog
A
About on SuperTechFans
博客园_首页
B
Blog RSS Feed
Martin Fowler
Martin Fowler
大猫的无限游戏
大猫的无限游戏
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
Vercel News
Vercel News
C
Check Point Blog
H
Hackread – Cybersecurity News, Data Breaches, AI and More
博客园 - 【当耐特】
M
MIT News - Artificial intelligence
宝玉的分享
宝玉的分享
T
Tailwind CSS Blog
I
InfoQ
罗磊的独立博客

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
KSEB pinning hopes on Kakkayam pumped storage project
The Hindu Bureau · 2026-06-28 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
The pumped storage project in Kozhikode district involves the reservoirs of the Kakkayam dam and the Peruvannamoozhi (Kuttiyadi) dam. (Photo for representation)

The pumped storage project in Kozhikode district involves the reservoirs of the Kakkayam dam and the Peruvannamoozhi (Kuttiyadi) dam. (Photo for representation)

The Kakkayam pumped storage project (PSP), for which the Kerala State Electricity Board (KSEB) entered into an agreement with Tata Consulting Engineers Ltd., could provide an installed capacity between 800 megawatts (MW) and 1,000 MW, making it one of the biggest PSPs currently under the active consideration of the KSEB.

Last week, the KSEB entrusted Tata Consulting Engineers with conducting the geo-technical studies and preparing the project blueprint and detailed project report. The project in Kozhikode district involves the reservoirs of the Kakkayam dam and the Peruvannamoozhi (Kuttiyadi) dam.

Interconnected reservoirs

PSPs have two interconnected reservoirs at different elevations. These projects make use of surplus grid power to pump water up from the lower to the upper reservoir when electricity demand is low. In times of higher demand, the stored water is released downstream to work the turbines in the power station to generate electricity. In the case of the Kakkayam PSP, Kakkayam dam will be the upper pool and the Kuttiyadi reservoir, the lower one.

Based on preliminary studies conducted by its Investigation Wing, the KSEB considers the location suitable for a PSP with an installed capacity between 800 MW and 1,000 MW with six-hour backup, a senior KSEB official told The Hindu on Sunday (June 28, 2026).

Tata Consulting Engineers is expected to submit its report within 15 months. The KSEB hopes to kick off work on the Kakkayam PSP by 2029 after securing the required approvals from the Central Electricity Authority and the forest and environment clearances.

One among four

The Kakkayam PSP is one of four PSPs currently under the active consideration of the power utility, the others being the 100 MW Mudirappuzha PSP in Idukki, the 700 MW Idukki PSP and the 100 MW Poringalkuthu PSP in Thrissur district.

While approving a KSEB capital investment plan in 2024, the Kerala State Electricity Regulatory Commission had advised it to explore the possibility of designing upcoming hydel projects to operate in ‘hybrid mode’—operating in generation mode during the rainy season and as PSPs during the summer. “This approach, if feasible, can ensure year-round operation and support peak summer demand, thereby enhancing the viability of new hydro investments,” it said.

Published - June 28, 2026 07:15 pm IST