惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

The GitHub Blog
The GitHub Blog
阮一峰的网络日志
阮一峰的网络日志
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
Apple Machine Learning Research
Apple Machine Learning Research
小众软件
小众软件
博客园 - 司徒正美
Last Week in AI
Last Week in AI
爱范儿
爱范儿
罗磊的独立博客
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
博客园_首页
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
The Cloudflare Blog
雷峰网
雷峰网
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
WordPress大学
WordPress大学
Jina AI
Jina AI
人人都是产品经理
人人都是产品经理
量子位
V
V2EX
博客园 - 叶小钗
宝玉的分享
宝玉的分享
T
Tailwind CSS Blog

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Bengaluru's widest road set to open by June end, but desi...
The Hindu Bureau · 2026-06-24 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
According to officials, the Major Arterial Road could witness bottlenecks because a 300-foot-wide road at either end converges into roads that are at least four times narrower.

According to officials, the Major Arterial Road could witness bottlenecks because a 300-foot-wide road at either end converges into roads that are at least four times narrower. | Photo Credit: Special arrangement

Bengaluru’s Major Arterial Road (MAR), the city’s widest road with a width of 320 feet, is set to be inaugurated by the end of June. The MAR runs parallel to NICE Road, passes through Nadaprabhu Kempegowda Layout (NPKL) and spans 10.76 km.

However, issues have surfaced in both its design and execution.

Earlier, The Hindu reported the possibility of bottlenecks at the ends of the road. Now, the Bangalore Development Authority (BDA) and Bengaluru Traffic Police (BTP) have planned to install traffic signals at both ends to address the issue, after considering diverting traffic through the interior roads of NPKL. The BDA was also thinking about an underpass at Magadi Road as a solution, but it has been junked.

High volume

According to sources, although some vehicles can be diverted through other roads, the volume of traffic at the connecting junctions is still expected to be high, making the installation of signals inevitable.

“The actual volume of vehicles can only be assessed once the stretch becomes fully operational and more people start using it. However, preliminary projections suggest the need for traffic signals,” a traffic official said.

Reason behind the problems

According to the official, the primary reason for bottlenecks is that a 300-foot-wide road at either end converges into roads that are at least four times narrower.

Moreover, the MAR connects Mysuru Road with Magadi Road. Magadi Road already experiences heavy traffic, particularly during weekends, and BTP officials say congestion at the MAR convergence point on Magadi Road is inevitable.

On the other hand, the MAR will not directly connect to the Bengaluru–Mysuru Access Controlled Highway. While the MAR ends near Challaghatta Metro Station, the highway begins a few kilometres earlier. As a result, commuters from the northwestern parts of the city who wish to access the highway will have to travel a few extra kilometres.

“When the road was planned, provisions could have been made for more connecting roads within NPKL, creating links to different points so that commuters would have multiple route options. Now, the BDA is exploring whether interior roads can be connected to different ends,” a source said.

According to BDA sources, the road was planned as far back as 2017, and the extent of the current issues and shortcomings could not have been foreseen at the time.

Great for connectivity

Despite the design flaws, the MAR provides a significant connectivity link between Mysuru Road (National Highway) and Magadi Road (State Highway). The 10.76-km stretch will also form part of the 54-km Peripheral Ring Road-1 (PRR), which will connect Hosur Road and Tumakuru Road via Bannerghatta Road, Hosur Road, and Magadi Road.

The road will comprise 10 lanes, including a six-lane main carriageway (three lanes on each side), four-lane service roads (two on each side), dedicated cycling tracks, and walkways with utility ducts beneath them. The service roads and main carriageways on both sides will be separated by 27.5-metre-wide boulevards.

Recent issues

A purported video that went viral on social media showed a portion of the MAR caving in following heavy rainfall on Saturday (June 20, 2026). The BDA identified the issue and rectified it within two days. The BJP also took to social media to criticise the Congress government over the allegedly shoddy work. BDA officials were unavailable for comment.

Published - June 24, 2026 06:21 pm IST