惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

L
LangChain Blog
阮一峰的网络日志
阮一峰的网络日志
WordPress大学
WordPress大学
博客园 - 司徒正美
罗磊的独立博客
D
Docker
Last Week in AI
Last Week in AI
爱范儿
爱范儿
M
MIT News - Artificial intelligence
V
V2EX
Google DeepMind News
Google DeepMind News
小众软件
小众软件
Apple Machine Learning Research
Apple Machine Learning Research
Microsoft Security Blog
Microsoft Security Blog
T
Tailwind CSS Blog
MyScale Blog
MyScale Blog
V
Visual Studio Blog
博客园 - 叶小钗
B
Blog RSS Feed
A
About on SuperTechFans
F
Fortinet All Blogs
T
The Blog of Author Tim Ferriss
Martin Fowler
Martin Fowler
P
Proofpoint News Feed

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Metro stations on Poonamallee-Vadapalani stretch ready to...
Sunitha Sekar · 2026-06-23 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
The 14.6-km stretch from Poonamallee to Vadapalani via Porur, which has been plagued by delays since February, received the final nod last month.

The 14.6-km stretch from Poonamallee to Vadapalani via Porur, which has been plagued by delays since February, received the final nod last month. | Photo Credit: B. VELANKANNI RAJ

The inauguration of Chennai Metro Rail’s first Phase II stretch by the Prime Minister Narendra Modi may happen soon, but some of the construction flaws, such as roofs leaking during rain continues.

The 14.6-km stretch from Poonamallee to Vadapalani via Porur, which has been plagued by delays since February, received the final approval last month, and commuters have been waiting for the launch. But these newly built stations seem to have flaws in their design and construction as rainwater leakage continues to be reported in some of these stations even after a short, intense spell of rain.

In stations such as Mullaithottam, Karayanchavadi, Kumananchavadi, Porur Bypass, Kattupakkam, and Thelliyaragaram, rainwater leakage was reported at the concourse, ticket issuing spaces, and equipment storage rooms, sources said. Rainwater was also reported to have reached platforms where computers were stationed.

“There was ample time from March till June to complete all the work. If they have completed, rainwater leakage should not be happening. Crores have been spent on the construction of these buildings. We cannot normalise such problems. If these things happen at a house, where we are going to live in, will we accept it?” a source asked.

According to Chennai Metro Rail Limited (CMRL) officials, they have already started the work to plug the leaks. “The contractors have already been informed, and we are identifying ways to ensure such leakage doesn’t occur again. The work will be completed at the earliest,” an official said.

This is not the first time rainwater leakage has been reported at stations between Poonamallee and Vadapalani. In April too, heavy rainwater leakage was reported in some of the stations after which repair work was carried out.

Published - June 23, 2026 07:23 pm IST