惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

博客园_首页
IT之家
IT之家
博客园 - Franky
Stack Overflow Blog
Stack Overflow Blog
宝玉的分享
宝玉的分享
Recent Announcements
Recent Announcements
Engineering at Meta
Engineering at Meta
S
SegmentFault 最新的问题
V
Visual Studio Blog
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
Last Week in AI
Last Week in AI
H
Help Net Security
V
V2EX
H
Hackread – Cybersecurity News, Data Breaches, AI and More
量子位
博客园 - 叶小钗
J
Java Code Geeks
博客园 - 【当耐特】
月光博客
月光博客
爱范儿
爱范儿
人人都是产品经理
人人都是产品经理
酷 壳 – CoolShell
酷 壳 – CoolShell
小众软件
小众软件

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Elevated corridor on NH5 likely if T.N. waives GST on con...
The Hindu Bureau · 2026-06-28 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

There remains a glimmer of hope for the construction of a 10.4-km-long elevated corridor from Madhavaram to Nallur toll plaza. Sources in the National Highways Authority of India (NHAI) said that the project would be revived if the State government waived its portion of the Goods and Sales Tax (GST) for the proposed project. 

“Around 60% of the cost would go towards materials, which attract GST and 9% on that is not much in terms of tax. The State government wants this project and so it would be their contribution towards the same. The land acquisition, if any, would be very minimal,” said a source. 

In February this year, during a meeting held by the Secretary to Government of India, Ministry of Road Transport and Highways with the Tamil Nadu Chief Secretary, the NHAI accepted to take up the elevated corridor project, subject to a waiver of the State’s component of GST. Accordingly, the modalities of implementation were being finalised along with the updation of the DPR, an official source explained. 

S. Suresh Babu, president of Billakuppam Village Residents Welfare Association, said that he had written to various offices, including the President of India, requesting for the construction of a corridor. “We hope the project will be taken up shortly and completed on time. The stretch has several traffic junctions that slow down vehicular movement considerably. Local vehicles fight for space among the thousands of heavy vehicles taking the National Highway,” he said. 

A retired highways department official said that instead of an elevated corridor, it would be better to construct three flyovers at Puzhal covering Retteri Road, at Kavankarai and at Sothupakkam junction covering Revathy Stores junction. 

“An elevated corridor would unnecessarily lead to toll plazas, and the cost would be much higher than three flyovers. Since around 60% of vehicles taking the road are two-wheelers, an elevated corridor would not be of any help. Whereas the flyovers at these locations would help reduce congestion at five junctions,” he explained. 

Published - June 28, 2026 02:13 am IST