惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

M
MIT News - Artificial intelligence
罗磊的独立博客
Hugging Face - Blog
Hugging Face - Blog
Apple Machine Learning Research
Apple Machine Learning Research
Last Week in AI
Last Week in AI
S
SegmentFault 最新的问题
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
美团技术团队
人人都是产品经理
人人都是产品经理
WordPress大学
WordPress大学
The Cloudflare Blog
IT之家
IT之家
雷峰网
雷峰网
小众软件
小众软件
博客园 - 叶小钗
博客园 - 聂微东
爱范儿
爱范儿
博客园 - 司徒正美
博客园 - 三生石上(FineUI控件)
V
Visual Studio Blog
博客园 - 【当耐特】
V
V2EX
博客园_首页
T
Tailwind CSS Blog

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Coimbatore’s 24x7 water supply project works set for comp...
The Hindu Bureau · 2026-06-26 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
The 24x7 drinking water supply project is aimed at providing uninterrupted drinking water supply to 1.5 lakh household service connections in Coimbatore city.

The 24x7 drinking water supply project is aimed at providing uninterrupted drinking water supply to 1.5 lakh household service connections in Coimbatore city. | Photo Credit: Siva SaravananS

The Coimbatore Corporation’s ₹646.71-crore 24x7 drinking water supply project is nearing completion, with 96% of the work finished. The remaining works are expected to be completed by August 2026.

The project is aimed at providing uninterrupted drinking water supply to 1.5 lakh household service connections (HSCs) across 105.6 sq. km covering the core areas of 58 wards in the city. Around one lakh household connections are already receiving continuous water supply under the project.

According to the project officials, the continuous pressurised distribution system has been designed to prevent contamination by ensuring that wastewater and other external impurities do not enter the pipelines. The entire system, from pumping water to overhead tanks to supplying households, is operated through an automated software-based system, reducing human intervention and operational errors.

The project includes the construction of 33 new overhead tanks in addition to the existing 34 tanks. Of these, 32 have already been commissioned. It also involves laying 73.64 km of feeder mains and 1,813.59 km of distribution pipelines. So far, 71.68 km of feeder mains and 1,759.43 km of distribution pipelines have been laid, leaving about 50 km of distribution mains to be completed.

Officials said obtaining permission to lay pipelines along stretches of State and National Highways has been one of the major challenges, resulting in delays. Restoration works on these roads can be carried out only during night hours, slowing the pace of execution.

Responding to complaints about pipeline leakages, the officials said most of them occur when pipelines are inadvertently damaged during excavation works undertaken by other departments or utility agencies, such as underground drainage and underground cable works. The Corporation has asked the public to report leakages by sending photographs through WhatsApp to 98650 60708 for prompt rectification.

Published - June 26, 2026 06:58 pm IST