惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

V
Visual Studio Blog
罗磊的独立博客
宝玉的分享
宝玉的分享
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
V
V2EX
酷 壳 – CoolShell
酷 壳 – CoolShell
T
Tailwind CSS Blog
博客园_首页
量子位
月光博客
月光博客
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
博客园 - 司徒正美
人人都是产品经理
人人都是产品经理
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
爱范儿
爱范儿
S
SegmentFault 最新的问题
雷峰网
雷峰网
小众软件
小众软件
博客园 - 聂微东
美团技术团队
Apple Machine Learning Research
Apple Machine Learning Research
WordPress大学
WordPress大学
Jina AI
Jina AI
Hugging Face - Blog
Hugging Face - Blog

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
IISc study says Namma Metro Blue Line can run entirely on...
2026-05-18 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
The report notes that BMRCL could immediately install up to 30 MWp of rooftop solar capacity without making any modifications to the existing traction infrastructure.

The report notes that BMRCL could immediately install up to 30 MWp of rooftop solar capacity without making any modifications to the existing traction infrastructure. | Photo Credit: K. MURALI KUMAR

A study by the Indian Institute of Science (IISc) has found that Bengaluru’s upcoming Namma Metro Blue Line can potentially operate entirely on solar energy on a net annual basis, using only land and infrastructure already owned by the Bangalore Metro Rail Corporation Limited (BMRCL).

The study, titled ‘Assessing the Potential of Directly Using Solar Power to Run the Operations of Blue Line of Namma Metro’, was conducted by the IISc Sustainable Transportation Lab in collaboration with BMRCL and supported by HSBC under its Corporate Social Responsibility (CSR) programme. According to the report, the nearly 55-km Blue Line corridor connecting Central Silk Board and Kempegowda International Airport under Metro Phases 2A and 2B can achieve full annual energy self-sufficiency through large-scale solar photovoltaic (PV) integration.

The researchers said that the project represents the first corridor-scale techno-economic analysis in India examining direct integration of solar power into a metro rail traction system. The report has already been submitted to BMRCL for consideration.

The study was led by Prof. Ashish Verma of IISc’s Department of Civil Engineering, along with a team of researchers from multiple departments. Conducted between August 2025 and March 2026, the research included modelling of the Blue Line’s traction power requirements, solar resource mapping across BMRCL properties, and analysis of train operations under different scenarios.

According to the findings, an installed solar capacity of 83.3 MWp would be sufficient to meet the corridor’s annual energy demand of 152 GWh under full-scale operations involving 21 trains running at two-minute intervals. Researchers estimated that BMRCL-owned properties, including station rooftops, elevated viaduct parapets, station canopies and depot rooftops, can accommodate between 79 MWp and 89 MWp of solar installations.

The report noted that BMRCL could immediately install up to 30 MWp of rooftop solar capacity without making any modifications to the existing traction infrastructure. This alone could offset around 36.5% of the corridor’s annual electricity consumption.

Researchers highlighted station rooftops as the most commercially attractive starting point. All 30 elevated stations together offer around 109,600 square metres of usable rooftop space, capable of supporting nearly 50,000 solar panels with a combined capacity of 29.75 MWp. The estimated investment for this first phase ranges between ₹48 crore and ₹63 crore, but the study projects annual electricity savings of ₹36.4 crore from the first year itself, with a payback period of less than two years.

Second phase

The second phase proposes extending solar infrastructure to viaduct parapets and station side canopies, increasing the total installed capacity to about 54 MWp. This phase is expected to generate annual savings exceeding ₹61 crore, while cumulative savings over the project’s lifetime could cross ₹2,600 crore.

The study also underlined the role of regenerative braking, which can recover around 29% of traction energy. When combined with rooftop solar generation, nearly 61% of the Blue Line’s total traction energy demand could be offset.

Apart from financial savings, the report emphasised significant environmental benefits. Phase 1 alone could prevent the emission of more than 44,500 tonnes of carbon dioxide annually, equivalent to removing nearly 19,000 petrol cars from Bengaluru’s roads. Under the expanded Phase 2 scenario, annual carbon savings could rise to nearly 77,900 tonnes.

Prof. Ashish Verma said the study demonstrates that metro rail systems can evolve into net-zero energy transport systems using their own physical infrastructure. He described the Blue Line project as “ready-to-tender infrastructure investment” with long-term economic and environmental returns, and urged BMRCL and the Karnataka government to move towards pilot implementation without delay.

The report has recommended that BMRCL immediately tender rooftop solar installations across all 30 stations, undertake structural surveys of depots and viaducts, and begin regulatory engagement with BESCOM and the Karnataka Electricity Regulatory Commission for net metering approvals.

Published - May 18, 2026 08:37 pm IST