惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

腾讯CDC
Microsoft Azure Blog
Microsoft Azure Blog
L
LangChain Blog
Y
Y Combinator Blog
Microsoft Security Blog
Microsoft Security Blog
宝玉的分享
宝玉的分享
B
Blog RSS Feed
MongoDB | Blog
MongoDB | Blog
Jina AI
Jina AI
D
Docker
B
Blog
Engineering at Meta
Engineering at Meta
Last Week in AI
Last Week in AI
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
I
InfoQ
G
Google Developers Blog
博客园 - Franky
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
The GitHub Blog
The GitHub Blog
T
The Blog of Author Tim Ferriss
大猫的无限游戏
大猫的无限游戏
阮一峰的网络日志
阮一峰的网络日志
U
Unit 42

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Extension of Kochi Water Metro ferries to Kadamakudy by Onam
John L. Paul · 2026-06-27 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
The Water Metro terminal at Kadamakudy. KWML is awaiting the delivery of three more ferries from Cochin Shipyard to extend operations to Kadamakudy.

The Water Metro terminal at Kadamakudy. KWML is awaiting the delivery of three more ferries from Cochin Shipyard to extend operations to Kadamakudy. | Photo Credit: FILE PHOTO

The services of the Kochi Water Metro ferries are expected to be extended to Kadamakudy, a popular tourist attraction in the district, by Onam.

A floating pontoon for berthing ferries is ready at the Kadamakudy terminal, while the final works on the much-awaited terminal are nearing completion. The electric charging infrastructure will be ready in 10 days. “We are currently awaiting the relocation of the many Chinese fishing nets along the route, which obstruct the smooth movement of ferries to the terminal. This may take up to two months and has to be initiated by the Fisheries department. Simultaneously, dredging of the terminal premises will be carried out to ensure adequate depth for the vessels,” said Sajan John, chief operating officer, Kochi Water Metro Limited (KWML).

KWML is awaiting the delivery of three more ferries from Cochin Shipyard to extend operations to Kadamakudy. The Kadamakudy extension will be followed by the extension of ferry services from the High Court terminal to Edakochi via Mattancherry, and subsequently by the commencement of operations from the Ernakulam terminal planned next to the State Water Transport department’s Ernakulam Boat Jetty. The tendering process for the terminal is under way, sources said.

Metro-airport link

KWML is awaiting the State government’s nod to operate ferries in the Aluva Metro station-international airport corridor through the Periyar. “The distance can be covered in around 15 minutes if Water Metro ferries are allowed to operate at a speed of 20 knots (36 kmph). The Metro station and the terminal can be linked directly if an approximately 70-metre-long skywalk is built,” sources said.

Meanwhile, Kochi Metro Rail Limited managing director Loknath Behera said a private engineering college had been tasked with conducting a study regarding the proposal. “The results are expected in a month’s time. A study on the technical aspects of the airport extension would follow suit,” he added.

Published - June 26, 2026 10:45 pm IST