惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

有赞技术团队
有赞技术团队
G
Google Developers Blog
T
Tailwind CSS Blog
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
人人都是产品经理
人人都是产品经理
J
Java Code Geeks
P
Proofpoint News Feed
V
Visual Studio Blog
爱范儿
爱范儿
The Cloudflare Blog
博客园 - 叶小钗
V
V2EX
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
M
MIT News - Artificial intelligence
Microsoft Security Blog
Microsoft Security Blog
博客园 - 聂微东
H
Help Net Security
B
Blog
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
博客园 - 【当耐特】
量子位
宝玉的分享
宝玉的分享
WordPress大学
WordPress大学
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Kochi’s new sewage treatment system awaiting govt. nod
2026-05-19 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

Kerala Water Authority (KWA)’s comprehensive sewage treatment system planned for Kochi Corporation is awaiting clearance from the new government.

The mega project, a major component of the Integrated Urban Regeneration and Water Transport System’s (IURWTS) canal rejuvenation project, involves setting up two high-capacity Sewage Treatment Plants (STPs). The revised project is currently awaiting administrative sanction and financial approval.

The two STPs, with a combined capacity of 105 MLD, have been designed keeping in mind the projected population requirements for 2050, according to KWA sources. Along with Kochi Corporation, the sewage scheme will also cater to neighbouring local bodies, including Kalamassery, Thripunithura, and Thrikkakara municipalities.

“The STPs are a major component of the canal rejuvenation project. It was found that these canals were highly polluted, and if they continued to remain in this state, it would pose a major environmental and health concern. In order to rejuvenate the canals, it is necessary to address the sewage inflow, which includes grey water and septage, and a comprehensive sewage network is the only solution,” said a KWA source. The official added that illegal dumping of sewage into canals could be prevented by setting up a sewerage network in the city.

“Sewage generation for the entire Kochi Corporation and parts of Kalamassery and Thrikkakara will be nearly 140 MLD. Of this, less than 5% is treated properly. Nearly 70% to 80% of the septage is discharged into canals. It is therefore crucial to develop a sewerage system,” the official added.

The Edappally Canal (11.23 km), Thevara-Perandoor Canal (11.15 km), Chilavanoor Canal (9.88 km), Thevara Canal (1.405 km), and Market Canal (0.66 km) are included in the project.

Of the two STPs, one will be set up at Elamkulam on KWA’s 13-acre land and will have a capacity of 55 MLD. The other will be set up at Muttar on a three-acre plot acquired by Kochi Metro Rail Limited (KMRL) and will have an installed capacity of 50 MLD.

The project, which was accorded administrative sanction in May last year, had to be resubmitted after the project estimate was revised. The project estimate was revised to ₹1,700 crore from ₹1,386 crore.

KMRL is the special purpose vehicle (SPV) of the IURWTS project, and KWA is the implementing agency of the sewerage component. Out of the 759 km envisaged under the Kochi Sewerage Master Plan, 478 km of sewerage network is included in the sewerage scheme under the IURWTS project.

About 73% of the population in Kochi Municipal Corporation is expected to benefit from the project, while 11% in Kalamassery municipality, 15% in Thrikkakara municipality, and 1% in Thripunithura municipality are also expected to benefit.

Published - May 19, 2026 01:26 am IST