惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Engineering at Meta
Engineering at Meta
G
Google Developers Blog
WordPress大学
WordPress大学
M
MIT News - Artificial intelligence
D
DataBreaches.Net
云风的 BLOG
云风的 BLOG
爱范儿
爱范儿
Microsoft Security Blog
Microsoft Security Blog
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
H
Hackread – Cybersecurity News, Data Breaches, AI and More
Blog — PlanetScale
Blog — PlanetScale
T
Tailwind CSS Blog
S
SegmentFault 最新的问题
阮一峰的网络日志
阮一峰的网络日志
博客园 - 三生石上(FineUI控件)
酷 壳 – CoolShell
酷 壳 – CoolShell
Recent Announcements
Recent Announcements
T
The Blog of Author Tim Ferriss
I
InfoQ
MyScale Blog
MyScale Blog
V
V2EX
B
Blog
罗磊的独立博客
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
KWA signs pact for 27-km sewage pipeline project
Aathira Haridas · 2026-06-15 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

As part of its efforts to overhaul Kochi’s sewerage system, the Kerala Water Authority (KWA) has signed an agreement with the lowest bidder to construct a 27-km sewage pipeline to carry sewage from select wards of the city. The pipeline is one of three components of the project, which also includes a 5-MLD Sewage Treatment Plant (STP) and a 17-km collection network. The bidder for the STP has also been selected, and the contract will be finalised after technical issues are resolved.

“Preliminary work on the 27-km network will begin next week.

A topographical and social survey will be conducted, followed by the installation of the pipeline in August,” said a KWA source.

The total length of the sewerage network, which will cater to three divisions in the city, is 44 km. The tendering process for the remaining 17 km of the sewage network has also begun.

“The STP will be able to handle the 4.5 MLD of sewage generated in the three divisions. The sewage reaching the STP will undergo three stages of treatment, along with ultra-filtration, and the treated water will comply with the standards prescribed by the National Green Tribunal and the Pollution Control Board. There are divisions within the city corporation limits that lack proper sanitation facilities, and the project will address those requirements,” the source said.

The projects are being executed under the AMRUT 2.0 Mission, and the total cost of the three components is ₹185 crore. The 5-MLD STP, along with a co-treatment facility, will come up at Elamkulam.

“We need to wait for the monsoon to subside before starting construction work. This is a multidisciplinary activity that requires coordination among several government departments. The project also requires an extensive social survey to identify apartments and other establishments that need to be connected to the network. We are in discussions with the civic authorities,” the source said.

Published - June 15, 2026 12:48 am IST