惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

WordPress大学
WordPress大学
博客园 - 司徒正美
Last Week in AI
Last Week in AI
博客园 - 聂微东
Jina AI
Jina AI
月光博客
月光博客
爱范儿
爱范儿
美团技术团队
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
Hugging Face - Blog
Hugging Face - Blog
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
博客园 - 叶小钗
T
Tailwind CSS Blog
博客园 - 【当耐特】
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
Apple Machine Learning Research
Apple Machine Learning Research
有赞技术团队
有赞技术团队
罗磊的独立博客
小众软件
小众软件
雷峰网
雷峰网
IT之家
IT之家
大猫的无限游戏
大猫的无限游戏
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
V
Visual Studio Blog

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
From improved apps to bus hubs to tailored services, city...
2026-05-14 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
Traffic jam on Outer Ring Road near Bellanduru in Bengaluru on Thursday, October 16, 2025. PHOTO : SUDHAKARA JAIN / THE HINDU

Traffic jam on Outer Ring Road near Bellanduru in Bengaluru on Thursday, October 16, 2025. PHOTO : SUDHAKARA JAIN / THE HINDU | Photo Credit: SUDHAKARA JAIN

In a bid to encourage more commuters on Outer Ring Road (ORR) to switch to public transport, BMTC will soon introduce its upgraded app that will provide precise details such as the exact arrival time of the buses and number of seats available in them.

Sivakumar B., managing director of the Bangalore Metropolitan Transport Corporation (BMTC), revealed this during a meeting convened by the Commissioner of Police, Bengaluru City, with other officials, ORR Companies Association (ORRCA) and representatives of IT companies and Tech parks on ORR to discuss sustainable measures for traffic decongestion along the corridor. 

Around 1,000 buses

According to Mr. Sivakumar, around 1,000 buses ply on the stretch between K.R. Puram and Silk Board.

Noting that the stretch is a high-potential route where the utilisation has remained relatively low, he proposed multiple options, such as the improved app that could be used by companies and employees to switch to public transport and improve the situation in the area.

“The BMTC app is currently not very precise. We are coming out with an upgraded version in a few days, which will tell you in how many minutes the bus will reach your location and also how crowded the bus is. The beta version is being tested now. By around June 15, it will be ready,” he said.

Bus hubs

He also said that if space could be provided, the department was open to lodging its buses at ORR, making it an origin and destination point.

“We can bring dedicated services on particular routes, provided we are assured with a certain number of people,” he said, further adding that the department will also be offering cards at much more discounted rates to companies that can onboard their staff to BMTC buses.  

Tailored options

City police commissioner Seemanth Kumar Singh expressed willingness to conduct local surveys at the earliest if there was a need for more feeder services or readjusting the timings of the services. He also offered tailored provisions for organisations. 

“If institutions can give us the number of people who require shuttle services towards metro or bus stand or even to any other dedicated place such as an apartment where 30 people are commuting from, we are ready to provide it,” he said. 

White topping concerns

With regards to the planned white-topping of the 17-km stretch, R.K. Misra, independent director at B-SMILE, said that the tender will be awarded within a month and the works will start by the time the monsoon sets in.

Traffic snarls on the stretch are expected to worsen once the work of the ₹368 Crore project starts, as the carrying capacity of the road would further reduce.

Justifying this, Mr. Misra said that the intent is to finish Metro and white-topping works simultaneously to ensure that all the infrastructure is in place together. Acknowledging that until then it would raise challenges, he requested cooperation from the companies.

“All the companies, please be prepared for major infrastructure work on this road. But we are getting very large pavers, and we are planning to do 500 to 600 meters every day,” he assured.

Published - May 13, 2026 11:04 pm IST