惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

G
Google Developers Blog
WordPress大学
WordPress大学
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
小众软件
小众软件
人人都是产品经理
人人都是产品经理
美团技术团队
Blog — PlanetScale
Blog — PlanetScale
S
SegmentFault 最新的问题
博客园 - 【当耐特】
V
V2EX
Microsoft Azure Blog
Microsoft Azure Blog
博客园 - 叶小钗
Google DeepMind News
Google DeepMind News
量子位
罗磊的独立博客
月光博客
月光博客
N
Netflix TechBlog - Medium
大猫的无限游戏
大猫的无限游戏
博客园_首页
P
Proofpoint News Feed
Jina AI
Jina AI
云风的 BLOG
云风的 BLOG
博客园 - 司徒正美
腾讯CDC

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Bachupally flyover cuts travel time for over 1.5 lakh veh...
Lavpreet Kaur · 2026-06-28 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
Bachupally flyover was opened on June 8 with the aim of easing traffic movement between Miyapur X roads and Gandimaisamma in Hyderabad.

Bachupally flyover was opened on June 8 with the aim of easing traffic movement between Miyapur X roads and Gandimaisamma in Hyderabad. | Photo Credit: By Arrangement

The newly inaugurated 1.3-km Bachupally flyover has brought long-awaited relief to thousands travelling between Miyapur, Bachupally, Nizampet, Mallampet, Bowrampet and Gandimaisamma, cutting travel time across one of the city’s busiest junctions. But less than a month since its opening, commuters say ongoing road widening works at both ends and concerns over sharp curves have prevented the project from delivering its full benefits.

Inaugurated on June 8, the flyover stretches from Mamata Academy of Medical Sciences (MAMS) near Bachupally X Roads to Sikhara Villas, bypassing one of the busiest traffic bottlenecks in north-west Hyderabad.

Plan of the 1.3-km Bachupally flyover on the Miyapur-Gandimaisamma stretch.

Plan of the 1.3-km Bachupally flyover on the Miyapur-Gandimaisamma stretch. | Photo Credit: By Arrangement

Residents say journeys that once involved waiting for more than 20 minutes at the Bachupally junction during peak hours now take just five to 10 minutes. “The flyover has benefitted locals in Bachupally a lot. Those travelling towards Hafeezpet and Miyapur can now go directly without getting caught up at the junction while local vehicles can continue to use the road underneath,” said Mohammad Faruq, a local vendor.

The improvement is also being felt by commuters travelling longer distances. Nishant, a software professional from Kompally, said his commute from Miyapur was cut by more than 10 minutes after Google Maps directed him onto the new flyover.

“Earlier, I took the Mallampet exit and used the Outer Ring Road to avoid the busy Bachupally junction. That journey usually took about an hour. This time I reached Kompally in just 48 minutes using the flyover,” he said.

Night view of Bachupally flyover between Miyapur X roads and Gandimaisamma stretch.

Night view of Bachupally flyover between Miyapur X roads and Gandimaisamma stretch. | Photo Credit: By Arrangement

The corridor serves as a crucial link for students travelling to educational institutions in Pragathi Nagar and Gandimaisamma, employees working in industrial areas such as IDA Bollaram, Mallampet and Kazipet, and thousands of IT professionals commuting to Hyderabad’s western technology corridor.

According to the Miyapur Traffic Inspector, at least 1.5 lakh vehicles ply this flyover every day. The route also serves as the main entry and exit point for hundreds of residential communities along the Miyapur-Bachupally stretch.

However, while traffic now moves faster on the elevated corridor, commuters continue to encounter congestion immediately before entering and exiting the flyover. “The flyover saves time, but once you get down you are back in slow-moving traffic because the adjoining roads are still under construction,” said one commuter.

Road widening works on the 15-kilometre Miyapur X roads to Gandimaisamma X roads corridor remain under way, creating bottlenecks at both ends and below. Officials said the widening of the stretch between Sri Nagulamma Temple and Miyapur X roads has been delayed because of pending land acquisition while work on the remaining sections is continuing.

Picture showing a curve in the flyover.

Picture showing a curve in the flyover. | Photo Credit: By Arrangement

Along with the speed come safety concerns. Two accidents have been reported on the flyover since its inauguration. On June 12, a lorry rammed into a car, injuring the 62-year-old woman driving it. In another incident, four cars were involved in a chain collision. Police attributed the accidents to “sharp curve” on the flyover.

Several commuters said the sharp curves at both ends of the flyover require motorists to slow down despite the wider carriageway. “I travelled on the flyover at night, and the turns at both the beginning and end felt quite sharp. Drivers need to be extra careful,” said another commuter.

Nishant also felt riding quality could be improved. “The road surface feels patchy in places, and the ongoing construction makes the stretch difficult to navigate,” he said.

Published - June 28, 2026 07:12 pm IST